Laserfiche WebLink
600 short handled sgq pt shovels <br />240 short handled rd pt shovels <br />36 long-hendled shovels <br />Lumber fort oilets and tool boxes 136.26 <br />Repair end equipment of -plows 78.61 <br />.2,300.03 <br />Job #1 1Max Grimes, supervisor <br />Twyckenham Dr., Howard St., Jacob St., end Corby St. <br />24,743 sq yds of sidewalk IFreded <br />$90.00 <br />90.00 <br />�j,81S sq yds of streets greded and graveled <br />19.80 <br />4,496 lin ft of bank sloped <br />10.57 <br />6,274 cu yds of dirt removed <br />X1.2_2__ <br />2,221 cu yds of gravel dug from pit and spreed on streets <br />157 men end 13 trucks employed by Eederal Government: <br />35 picks <br />42.75 <br />Uity- Cost <br />pails <br />•90 <br />Plow end t-r-actor furnished 28 hours @ $2.00 <br />$56.00 <br />$56.00 <br />28 men hours @44¢ <br />12.32 <br />5.00 <br />46 gellon-s of gcsoline @.151 <br />6.94 <br />Proportionate cost of lighting <br />1.22 <br />12.00 <br />70.4?-, <br />70,48 <br />12 axes <br />18.6o <br />2 <br />4.68 <br />20 road rakes <br />20.00 <br />44 pitch forks <br />4.00 <br />5.00 <br />2.40 <br />4 scythes <br />5 00 <br />5.60 <br />23 barricades <br />3Z* 50 <br />200 24" grede stakes <br />5.0'0 <br />150.80 <br />1 scythe stone <br />.12 <br />•50 <br />136 shovels <br />176.80 <br />1.50 <br />20 picks <br />25.00 <br />•32 <br />4 sledges' <br />7.00 <br />1.00 <br />3 palls " <br />,90 <br />1.10 <br />3 dippers <br />.60 <br />45.25 <br />5 balls mason line <br />2.00 <br />I� grub hoes <br />5.00 <br />2 pPdlocks <br />1.20 <br />2 points <br />1.70 <br />4 crow. bars <br />1.20 <br />30.2 <br />o3 8.62 <br />TOTAL <br />435.10 <br />Job #2 John- Smoger, supervisor <br />Olive Street, Berger Street, and Fremont Street <br />14,856 cu yds of dirt moved <br />1,5583 lin ft of streets graded and graveled <br />2,024 lin ft of terrace and wally graded <br />650 cu yds dug from pit and used on above <br />120 men and 15 trucks furnished by Federal Government <br />City cost_ - <br />Plow and tractor furnished 45 hours @ $2.00 <br />$90.00 <br />90.00 <br />45 men hours @ 44o- <br />19.80 <br />70 gallons gasoline @ .151 <br />10.57 <br />.Proportionate cost of lighting <br />X1.2_2__ <br />91.59 <br />35 picks <br />42.75 <br />pails <br />•90 <br />dippers <br />.80 <br />1 toilet <br />5.00 <br />4 barricades <br />12 rakes <br />12.00 <br />1 point <br />�60 <br />crow b ?rs <br />2 <br />4.68 <br />6 mattocks <br />1 tool box <br />5.00 <br />2.40 <br />6 tells mason line <br />5.60 <br />225 grade stakes <br />116 shovels <br />150.80 <br />1 fit -e <br />•50 <br />2 clew hernmers <br />1.50 <br />8 lbs mails <br />•32 <br />1 push broom <br />1.00 <br />1 sledge <br />1.10 <br />2 axes -. <br />45.25 <br />245.29 <br />TOTAL <br />416.84 <br />Job #3 John Smoger, supervisor <br />Huey St., Brookfield St., and alleys in vicinity <br />(12,370 sq yds of streets graded and graveled <br />149 sq yds of alleys graded and greveled <br />530 sq yds of parkway graded <br />227 sq yds of b?nk sloped <br />3,80-7 cu yds of-dirt moved <br />1,795 cu yds of - gravel dug from pits end spread on streets and alleys <br />5 catch basins built <br />118 men and 13 trucks furnished by Federal Government <br />City cost 54.00 <br />Grader 18 hours @ $3.00 <br />•1 <br />M <br />• <br />is <br />