Laserfiche WebLink
805 Arch AvenueAddress:01 - Lead HazardsUnit: <br />Room 6 - Screened PorchLocation:0Approx. Wall SF: 0Ceiling/Floor SF:5 - <br />Spec Quantity Units Unit Price Total PriceSpec # <br />Trade: 219 Lead Abatement <br />accordance with manufacturer's directions. Provide adequate <br />worker protection. Apply chemical stripper and any <br />recommended cover sheet in accordance with manufacturer's <br />specifications. Neutralize and rinse surface in accordance with <br />manufacturer's directions. Collect residue and rinse water in 55 <br />gal drums. Provide disposal of drums. Chemical must be <br />pre-approved by Project Manager. Following paint removal, the <br />Project Manager must inspect to verify completion. Upon <br />approval by Project Manager, prime and apply coat of paint to <br />owner's selection of standard paint colors. If repainting occurs <br />prior to Project Manager approval, Contractor shall remove all <br />paint again. <br />Threshold - Side B (To Room 5) <br />Location Total:____________ <br />Page 8 of 27