Laserfiche WebLink
805 Arch AvenueAddress:01 - Lead HazardsUnit: <br />Room 7 - KitchenLocation:0Approx. Wall SF: 0Ceiling/Floor SF:6 - <br />Spec Quantity Units Unit Price Total PriceSpec # <br />Trade: 9 Environmental Rehab <br />9436.2 1.00 EAWINDOW--TROUGH, JAMB, & STABILIZE ________________ <br />After establishing any required floor containment with <br />polyethylene sheeting. Temporarily remove window sashes. <br />Laminate trough/well with .027 aluminum coil stock. Mist <br />defective paint with water to the point of saturation. Wet scrape <br />all exposed paint on jambs and troughs. Wash with detergent <br />solution, rinse, allow to dry and HEPA vacuum all visible paint <br />chips, dust, and debris. <br />Any exposed Jamb paint must be stabilized and painted. <br />Window Trough - Window 22 <br />LBPSCPI 73.00 SFSCRAPE AND PAINT - INTERIOR ________________ <br />After establishing any required floor containment with <br />polyethylene sheeting, mist defective paint area with water to <br />the point of saturation. <br />Repair substrate as necessary to ensure proper adhesion and <br />performance and aggressively scrape all loose paint with a <br />scraper. Feather edges with a wet, 100-grit, sponge sanding <br />block. Detergent wash, rinse, allow to dry, and HEPA vacuum <br />all visible chips. Prime, caulk seams and top coat with premium <br />acrylic latex per manufacturer's instructions. <br />Components contain deteriorated lead-based paint. <br />Containment Required per 24 CFR 35.1345. <br />Wall - Side A <br />Location Total:____________ <br />Page 9 of 27