My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
805 Arch Avenue_AA 2026-0625B
sbend
>
Public
>
Historic Preservation
>
2026
>
July
>
Administrative Approvals
>
805 Arch Avenue_AA 2026-0625B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2026 10:41:37 AM
Creation date
6/29/2026 10:41:11 AM
Metadata
Fields
Template:
South Bend HPC
HPC Street Address
805 Arch Avenue
HPC Document Type
Certification
HPC Local Historic District
ii. Edgewater Drive
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
805 Arch AvenueAddress:01 - Lead HazardsUnit: <br />Room 7 - KitchenLocation:0Approx. Wall SF: 0Ceiling/Floor SF:6 - <br />Spec Quantity Units Unit Price Total PriceSpec # <br />Trade: 9 Environmental Rehab <br />9436.2 1.00 EAWINDOW--TROUGH, JAMB, & STABILIZE ________________ <br />After establishing any required floor containment with <br />polyethylene sheeting. Temporarily remove window sashes. <br />Laminate trough/well with .027 aluminum coil stock. Mist <br />defective paint with water to the point of saturation. Wet scrape <br />all exposed paint on jambs and troughs. Wash with detergent <br />solution, rinse, allow to dry and HEPA vacuum all visible paint <br />chips, dust, and debris. <br />Any exposed Jamb paint must be stabilized and painted. <br />Window Trough - Window 22 <br />LBPSCPI 73.00 SFSCRAPE AND PAINT - INTERIOR ________________ <br />After establishing any required floor containment with <br />polyethylene sheeting, mist defective paint area with water to <br />the point of saturation. <br />Repair substrate as necessary to ensure proper adhesion and <br />performance and aggressively scrape all loose paint with a <br />scraper. Feather edges with a wet, 100-grit, sponge sanding <br />block. Detergent wash, rinse, allow to dry, and HEPA vacuum <br />all visible chips. Prime, caulk seams and top coat with premium <br />acrylic latex per manufacturer's instructions. <br />Components contain deteriorated lead-based paint. <br />Containment Required per 24 CFR 35.1345. <br />Wall - Side A <br />Location Total:____________ <br />Page 9 of 27
The URL can be used to link to this page
Your browser does not support the video tag.