My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Main St Housing Parking Garage Proj No 125-065 - FA Wilhem
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2026
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Proposals - Main St Housing Parking Garage Proj No 125-065 - FA Wilhem
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2026 2:42:24 PM
Creation date
3/10/2026 2:42:09 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/10/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6MORRIS PARKING GARAGE | PROJECT #125-065 <br />TYLER BLANK <br />PRECONSTRUCTION MANAGER <br />• Supervision of all cost estimates, value engineering and future construction during the <br />preconstruction services period <br />• Coordination of architectural and structural design work with the MEP Consultant <br />• Reviews updated documents and provides appropriate comments related to design <br />• Project planning and logistical considerations <br />• Supervises preparation of the GMP proposal <br />• Manages the development of the trade/subcontractors bid manuals <br />PROJECT EXPERIENCEYEARS OF EXPERIENCE <br />17 <br />EDUCATION <br />B.S., Business Administration, <br />Ball State University <br />TRAINING & <br />CERTIFICATIONS <br />Primavera <br />Microsoft Project <br />On Screen <br />Agtek <br />Revit <br />Navisworks <br />AutoCAD <br />Sage Timberline <br />Four Winds Resort Casino and Parking Garage <br />Pokagon Band of Potawatomi Indians | South Bend, IN <br />Wilhelm Construction served as the Construction Manager for a new 24-story hotel <br />tower which included a full-service space, event arena, conference rooms, meeting <br />rooms, Five-Diamond Spa & Resort, rooftop pool deck, bar, and grill. Additionally, project <br />scope included a 43,000 SF gaming expansion that is connect between the new hotel <br />and the existing casino. <br />University of Kentucky Mixed Use Parking Structure <br />Signet UK Parking, LLC. | Lexington, KY <br />Re-imaging a critical piece of the University of Kentucky’s property, the Mixed-Use <br />Parking Structure will make progress on the University’s Transportation Master Plan as <br />well as serving the needs of students, faculty and staff. This new six-story facility, that <br />encompasses 903 parking spaces and 15,000 SF of mixed-use space, will help make <br />the campus more accessible with more parking and restaurants. This facility will help the <br />university’s efforts to create a more innovative space for students and staff as well as <br />the community. <br />DBU Indianapolis Parking Structure <br />Cummins Inc. | Indianapolis, IN <br />New headquarter facilities for this global giant provide innovative spaces and <br />sustainable green design and construction, and include one building, a parking <br />structure, and public gardens / gathering spaces. <br />IU Health Goodman Hall/ Neuroscience Center & Parking Structure <br />Landmark Healthcare Facilities, LLC. | Indianapolis, IN <br />Innovative facility bringing the expertise of research, testing and diagnostics, and <br />treatment therapies together for unrivaled neurological care. The project includes a <br />state-of-the-art, five story neuroscience center, a six-level parking structure, and an <br />elevated pedestrian walkway spanning 16th Street. This project is LEED Gold Certified. <br />CJC Parking Garages <br />Indy Penn Center, LLC | Indianapolis, IN <br />This new 15-story hotel will be 208,000 sf with 316 hotel rooms and is located in the <br />heart of downtown Indianapolis at Pennsylvania and Georgia Streets. Accompanying <br />the hotel is an 8-level 382 space parking garage located to the north of the hotel with a <br />pedestrian connector. <br />3. FIRM BACKGROUND/TEAM/EXPERIENCE <br />CMc <br />CMc <br />CMc <br />CMc
The URL can be used to link to this page
Your browser does not support the video tag.