My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Traffic Signal central management Proj No 125-051 - United Consulting
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Proposals - Traffic Signal central management Proj No 125-051 - United Consulting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2025 12:49:28 PM
Creation date
8/26/2025 12:49:02 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/26/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Approach <br />STEP 2: SCOPING REPORT <br />■ Field observations in conjunction with available online <br />mapping data to determine the existing signal infrastructure <br />at each intersection. As a cost savings measure, UNITED WIII <br />work with the City to determine what existing signal equipment <br />is in good condition and working order, allowing the equipment <br />to remain in place. Rather than assuming all equipment will <br />be replaced, this method reduces construction costs for each <br />intersection. <br />■ A review of the signal design against current industry <br />standards and criteria. UNITED will identify potential upgrades <br />to bring signals into compliance with current design standards. <br />■ A preliminary Red Flag Investigation for the intersections <br />initially identified for modernization. Understanding the locations <br />and potential impacts to adjacent environmental resources may <br />impact the programming of future improvements. <br />■ A preliminary utility investigation to determine potential <br />impacts. UNITED will review planned signal improvements <br />against existing utility conditions to determine potential impacts <br />and anticipated relocations. <br />■ A review of existing right-of-way and identification of intersections where land acquisition maybe required. Understanding <br />the right-of-way needs at each intersection will allow improvements for signals with sufficient right of way to be programmed first <br />minimizing the project development time for the initial signal improvements to occur. <br />■ A preliminary review of permits anticipated to be required. <br />■ A planning level cost estimate will be provided, including the central traffic signal system and signal modernization costs. <br />BEST <br />PLACES <br />INDIANA v UNITED CONSULTING ■ CITY OF SOUTH BEND ■ TRAFFIC SIGNAL CENTRAL MANAGEMENT SYSTEM - DES NO. 2500054 - LAPORTE DISTRICT 5 <br />JW <br />
The URL can be used to link to this page
Your browser does not support the video tag.