Laserfiche WebLink
Project Approach <br />STEP 3: FHWA PROCESS FOR CENTRAL SYSTEM SELECTION <br />This technical expertise will allow UNITED to guide the City of South Bend seamlessly through the process of determining the goals <br />and objectives for the proposed system ensuring the selected system meets the needs of the City. Based on the Federal Highway's <br />Model Systems Engineering Documents, the primary steps of the selection process are outlined below. <br />This document will explain, at a <br />high level, how the central system <br />will be used from an operational <br />perspective. It will detail how <br />the system will operate, who will <br />be involved in its operation, and <br />how it will meet the needs of the <br />project stakeholders. <br />This verification plan outlines how <br />the system's performance will <br />be verified against the defined <br />requirements. <br />The validation plan outlines <br />the methods and processes <br />used to measure the system's <br />performance. It will determine <br />if the system meets the needs <br />outlined in the Concept of <br />Operations. <br />FHWA'S SELECTION PROCESS <br />M <br />/VQ <br />j'ArES Of <br />CONCEPT OF <br />IOPERATIONS REPORT <br />(CONOPS) <br />VERIFICATION PLAN <br />BEST <br />PLACES <br />ITO - IN <br />NDIANA. v UNITED CONSULTING ■ CITY OF SOUTH BEND is TRAFFIC SIGNAL CENTRAL MANAGEMENT SYSTEM - DES N0.2500054 - LAPORTE DISTRICT <br />JW <br />