My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Traffic Signal central management Proj No 125-051 - United Consulting
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Proposals - Traffic Signal central management Proj No 125-051 - United Consulting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2025 12:49:28 PM
Creation date
8/26/2025 12:49:02 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/26/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Approach <br />STEP 3: FHWA PROCESS FOR CENTRAL SYSTEM SELECTION <br />This technical expertise will allow UNITED to guide the City of South Bend seamlessly through the process of determining the goals <br />and objectives for the proposed system ensuring the selected system meets the needs of the City. Based on the Federal Highway's <br />Model Systems Engineering Documents, the primary steps of the selection process are outlined below. <br />This document will explain, at a <br />high level, how the central system <br />will be used from an operational <br />perspective. It will detail how <br />the system will operate, who will <br />be involved in its operation, and <br />how it will meet the needs of the <br />project stakeholders. <br />This verification plan outlines how <br />the system's performance will <br />be verified against the defined <br />requirements. <br />The validation plan outlines <br />the methods and processes <br />used to measure the system's <br />performance. It will determine <br />if the system meets the needs <br />outlined in the Concept of <br />Operations. <br />FHWA'S SELECTION PROCESS <br />M <br />/VQ <br />j'ArES Of <br />CONCEPT OF <br />IOPERATIONS REPORT <br />(CONOPS) <br />VERIFICATION PLAN <br />BEST <br />PLACES <br />ITO - IN <br />NDIANA. v UNITED CONSULTING ■ CITY OF SOUTH BEND is TRAFFIC SIGNAL CENTRAL MANAGEMENT SYSTEM - DES N0.2500054 - LAPORTE DISTRICT <br />JW <br />
The URL can be used to link to this page
Your browser does not support the video tag.