Laserfiche WebLink
REGULAR MEETING <br />JULY 22, 2025 153 <br />Indianapolis, IN 46218 <br />gnewmanl2345kgmail.com; garrykppm.us.com <br />Quotation was submitted by Mr. Garry Newman <br />Non -Collusion, Non -Discrimination Affidavit Form was completed. <br />Three (3) Forms MWBE-1.0, 2.0, 2.1 were completed. <br />OTE: <br />Upon a motion made by VP Molnar, seconded by Mr. Miller and carried by roll call, the above <br />quotations were referred to Engineering for review and recommendation. <br />OPENING OF QUOTATIONS — SOUTH BEND WWTP DIGITAL TWIN SENSORS <br />INSTALLATION — PROJECT NO. 124-036 (WASTEWATER FUND) <br />President Maradik advised that this was the date set for the receiving and opening of sealed <br />quotations for the above referenced project. The following quotations were opened and read: <br />SWENEY ELECTRIC CO., INC. <br />9111 Louisiana Street <br />Merrillville, IN 46410 <br />ccuratolonsweneyelectric. com <br />Bid was submitted by Mr. Chris Curatolo <br />Non -Collusion, Non -Discrimination Affidavit Form was completed. <br />Five percent (5%) Bid Bond was submitted. <br />Two (2) Forms MWBE-1.0, 2.0, 2.1 were completed. <br />BID: <br />Base Bid Total $109,150 <br />Upon a motion made by VP Molnar, seconded by Mr. Miller and carried by roll call, the above <br />quotations were referred to Engineering for review and recommendation. <br />OPENING OF QUOTATIONS — 2025 BRICK PAVEMENT SPOT REPAIRS — PROJECT NO. <br />125-015 PR-000421 I D <br />President Maradik advised that this was the date set for the receiving and opening of sealed <br />quotations for the above referenced project. The following quotations were opened and read: <br />ACORN LANDSCAPING LLC <br />3680 West Sample Street <br />South Bend, IN 46619 <br />jeffritschardkyahoo.com; info(d),,acornlandscapers.com <br />Quotation was submitted by Mr. Jeff Ritschard <br />Non -Collusion, Non -Discrimination Affidavit Form was completed. <br />Three (3) Forms MWBE-1.0, 2.0, 2.1 were completed. <br />One (1) of One (1) Addendums Acknowledgements received. <br />:o <br />Base Quote Total <br />$123,028 <br />Alternate 1 <br />$25,975 <br />Alternate 2 <br />$29,394 <br />Base Plus Alternates <br />$178,397 <br />Upon a motion made by VP Molnar, seconded by Mr. Miller and carried by roll call, the above <br />quotations were referred to Engineering for review and recommendation. <br />AWARD BID AND APPROVE CONTRACT — 2025 CONTRACTOR PAVING ROUND 2 — <br />PROJECT NO. 125-034 (PR-00040888) <br />Dan Jones, Engineering, advised the Board that on July 8, 2025, bids were received and opened <br />for the above referenced project. After reviewing those bids, Mr. Jones recommended that the <br />Board award the contract to the lowest responsive and responsible bidder, Rieth-Riley <br />Construction Co., Inc., in the amount of $2,196,392.10. Therefore, VP Molnar made a motion that <br />the recommendation be accepted, and the bid be awarded, and the contract approved as outlined <br />above. Mr. Miller seconded the motion, which carried by roll call. <br />