Laserfiche WebLink
Client: City of South Bend <br />Project Name: Lathrop Watermain and Street Reconstruction From Bendix to Portage �► <br />Project No.: 25-2171 A&Z ENGINEERING <br />¢a ¢� ¢A <br />¢ a ¢a ¢a oa <br />Manhour Justification c�Q� tQ4l <br />¢° <br />Task Description <br />Totals <br />Total Fee <br />Task 5 100% Plan Submission <br />0 <br />0 <br />27 <br />32 <br />51 <br />0 <br />0 <br />0 <br />0 <br />110 <br />$ 15,845 <br />82 Title Sheet <br />1 <br />$ 135 <br />83 Finalize Index Sheet with Pertinent Utility Information <br />1 <br />$ 135 <br />84 Typical Cross Sections / 1 shts <br />1 <br />1 <br />$ 295 <br />85 Maintenance of Traffic - Road Closed / Detour Signage (1 "=500') / 1 Sht <br />1 <br />2 <br />$ 430 <br />86 Plan and Profile (1" = 20') / 7 Shts <br />2 <br />4 <br />8 <br />$ 1,980 <br />87 Plan and Profile (1" = 20') / 7 Side Streets / 2 Shts <br />1 <br />4 <br />4 <br />$ 1,280 <br />88 Construction Details Shts (Curb ramps, Intxn) / 2 Shts <br />1 <br />2 <br />4 <br />$ 990 <br />89 Finalize Drainage Design <br />1 <br />2 <br />2 <br />$ 720 <br />90 Finalize Gridsmart Signal Design <br />$ - <br />91 Cross -Section Sheets / 17 Shts <br />2 <br />4 <br />4 <br />$ 1,440 <br />92 Pavement Marking and Sign (1" = 40') / 4 Shts <br />1 <br />2 <br />2 <br />$ 720 <br />93 Structure Data Table <br />1 <br />1 <br />1 <br />$ 440 <br />94 Pavement otys/Approach Table <br />1 <br />2 <br />4 <br />$ 990 <br />95 Erosion Control Plans (1 "= 40') / 4 Shts+ 2 detail Shts <br />1 <br />2 <br />$ 430 <br />96 Watennain Details / 1 Sht <br />1 <br />2 <br />2 <br />$ 720 <br />97 Standard/ Miscellaneous Details / 1 Shts <br />1 <br />1 <br />2 <br />$ 575 <br />98 Permit Application- CSGPIDEMPermit <br />0 <br />0 <br />$ - <br />99 Permit Application- IDEM Water Main Const Permit <br />0 <br />0 <br />$ - <br />100 Specifications <br />4 <br />4 <br />$ 1,180 <br />101 Utility Coordination (Conflict Analysis) <br />1 <br />6 <br />$ 1,030 <br />102 Geotech Subconsultant Coordination (GME) <br />0 <br />$ - <br />103 Cly Calcs and Cost Est <br />1 <br />2 <br />4 <br />$ 990 <br />104 Q4/QC time <br />4 <br />$ 640 <br />105 Ml - City review / Site Visit <br />2 <br />2 <br />$ 590 <br />106 Compliance with City at 100 % Review <br />0 <br />1 <br />$ 135 <br />Task 6 Prebid Assistance <br />0 <br />20 <br />0 <br />20 <br />0 <br />0 <br />0 <br />0 <br />0 <br />109 Attend Prebid Ml <br />8 <br />8 <br />$ 2,560 <br />110 Prebid Ml Minutes <br />4 <br />2 <br />$ 990 <br />111 IssueAddendums <br />8 <br />10 <br />$ 2,850 <br />Task 7 Precon Mtg & Constrn Admin <br />0 <br />24 <br />0 <br />20 <br />0 <br />0 <br />0 <br />0 <br />0 <br />44 <br />112 Attend Precon <br />8 <br />8 <br />$ 211,560 <br />113 Shop Drawings <br />8 <br />8 <br />$ 2,560 <br />114 Attend Virtual Progress mtgs <br />8 <br />1 4 <br />1 <br />$ 1,980 <br />Totals <br />44 <br />304 <br />686 <br />873 <br />0 <br />76 <br />49 <br />4 <br />1930 <br />$294,620 <br />