Laserfiche WebLink
Client: City of South Bend <br />Project Name: Lathrop Watermain and Street Reconstruction From Berl to Portage �► <br />Project No.: 25-2171 A&Z ENGINEERING <br />¢a ¢� ¢A <br />¢ a ¢a ¢a oa <br />Manhour Justification O��` tQ4l <br />¢° <br />Task Description <br />Totals <br />Total Fee <br />Task 4 90 % Plan Submission <br />0 <br />0 <br />77 <br />162 <br />270 <br />0 <br />0 <br />0 <br />0 <br />509 <br />$ 72,260 <br />57 Title Sheet <br />1 <br />$ 160 <br />58 Finalize Index Sheet with Pertinent Utility Information <br />4 <br />$ 540 <br />59 Typical Cross Sections / 1 shts <br />2 <br />2 <br />$ 560 <br />60 Maintenance of Traffic - Road Closed / Detour Signage (1 "=500') / 1 Sht <br />8 <br />16 <br />$ 3,320 <br />61 Plan and Profile (1" = 20') / 7 Shts <br />4 <br />24 <br />40 <br />$ 9,520 <br />62 Plan and Profile (1" = 20') / 7 Side Streets / 2 Sal <br />2 <br />16 <br />24 <br />$ 5,880 <br />63 Construction Details Shts (Curb ramps, Intxn) / 2 Shts <br />2 <br />16 <br />16 <br />$ 4,800 <br />64 Finalize Drainage Design <br />2 <br />8 <br />8 <br />$ 2,560 <br />65 Finalize Gridsmart Signal Design <br />0 <br />0 <br />$ - <br />66 Cross -Section Sheets / 17 Shts <br />4 <br />32 <br />40 <br />$ 10,680 <br />67 Pavement Marking and Sign (1" = 40') / 4 Shts <br />2 <br />4 <br />16 <br />$ 3,060 <br />68 Structure Data Table <br />2 <br />2 <br />4 <br />$ 1,150 <br />69 Pavement Citys/Approach Table <br />2 <br />2 <br />8 <br />$ 1,690 <br />70 Erosion Control Plans (1 "= 40') / 4 Shts+ 2 detail Shts <br />2 <br />8 <br />12 <br />$ 3,100 <br />71 Waterrnain Details/ 1 Sht <br />2 <br />6 <br />8 <br />$ 2,270 <br />72 Standard/ Miscellaneous Details / 1 Sht <br />4 <br />4 <br />$ 1,120 <br />73 Permit Application- CSGPIDEMPermit <br />4 <br />4 <br />$ 1,180 <br />74 Permit Application- IDEM Water Main Const Permit <br />4 <br />4 <br />$ 1,180 <br />75 Specifications <br />16 <br />8 <br />$ 3,640 <br />76 Utility Coordination (workplan cood) <br />2 <br />16 <br />16 <br />$ 4,800 <br />77 Geotech Subconsultant Coordination (GME) <br />2 <br />$ 290 <br />78 Qy Calcs and Cost Est <br />2 <br />4 <br />12 <br />$ 2,520 <br />79 Q4/QCtime <br />12 <br />$ 1,920 <br />80 Mtg-City Review / Site Visit <br />8 <br />1 <br />8 <br />$ 2,360 <br />81 Compliance with City at 90 % Review <br />4 <br />1 8 <br />16 <br />$ 3,960 <br />