My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Lathrop Water Main Loop Proj No 125-035 - A&Z Engineering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Lathrop Water Main Loop Proj No 125-035 - A&Z Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2025 11:50:58 AM
Creation date
8/12/2025 11:49:33 AM
Metadata
Fields
Template:
Board of Public Works
Document Date
8/12/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Client: City of South Bend <br />Project Name: Lathrop Watermain and Street Reconstruction From Bendix to Portage �► <br />Project No.: 25-2171 A&Z ENGINEERING <br />e+ eA <br />e + e+ e+ of . Ac + . ac <br />Manhour Justification c.Q` Q4 °A a�oayo'o� +Deyego r�� cJte� cJe�' ter <br />Q�C 5t+Q t�C toe +5J Cee yJt� EGG tyo G +y0 V+ Qa <br />5 5 9 �co) yt ^Qe ryQe <br />Task Description Totals Total Fee <br />Labor Summary <br />CONSTRUCTION PLANS <br />Total Hrs <br />Total Fee <br />Task 1 Topographic Survey <br />0 <br />0 <br />0 <br />70 <br />38 <br />0 <br />76 <br />31 <br />4 <br />219 <br />$ 32,725 <br />Task 2 Location Control Route Survey Plat (LCRSP) <br />0 <br />0 <br />0 <br />80 <br />8 <br />0 <br />0 <br />18 <br />0 <br />106 <br />$ 16,190 <br />Task 3 50 % Design Submission <br />0 <br />0 <br />200 <br />302 <br />506 <br />0 <br />0 <br />0 <br />0 <br />1008 <br />$ 144,100 <br />Task 4 90 % Plan Submission <br />0 <br />0 <br />77 <br />162 <br />270 <br />0 <br />0 <br />0 <br />0 <br />509 <br />$ 72,260 <br />Task 5 100 % Plan Submission <br />0 <br />0 <br />27 <br />32 <br />51 <br />0 <br />0 <br />0 <br />0 <br />110 <br />$ 15,845 <br />Task 6 Prebid Assistance <br />0 <br />20 <br />0 <br />20 <br />0 <br />0 <br />0 <br />0 <br />0 <br />40 <br />$ 6,400 <br />Task 7 Precon Mtg & Constm Admin <br />0 <br />24 <br />0 <br />20 <br />0 <br />0 <br />0 <br />0 <br />0 <br />44 <br />$ 7,100 <br />TOTALS <br />0 <br />44 <br />304 <br />686 <br />873 <br />0 <br />76 <br />49 <br />4 <br />2036 <br />$ 294,620 <br />Hour Totals <br />0 <br />44 <br />304 <br />686 <br />873 <br />0 <br />76 <br />49 <br />4 <br />2036 <br />$ 294,620 <br />Labor Rate <br />210.00 <br />175.00 <br />160.00 <br />145.00 <br />135.00 <br />125.00 <br />145.00 <br />195.00 <br />95.00 <br />Labor Cost <br />$ - <br />$ 7,700 <br />$ 48,640 <br />$ 99,470 <br />S 117,855 <br />$ - <br />$ 11,020 <br />$ 9,555 <br />$ 380 <br />$ 294,620 <br />Labor Multiplier <br />1.000 <br />Labor Total <br />$ - <br />$ 7,700 <br />$ 48,640 <br />$ 99,470 <br />$ 117,855 <br />$ - <br />$ 11,020 <br />$ 9,555 <br />$ 380 <br />$ 294,620 <br />a5 <br />Sub Consultant Expenses /'101- <br />Task Description <br />Total Exp <br />Geotechnical Investigation & Report <br />$8,500.00 <br />$ 9,350 <br />Totals <br />$8,500.00 <br />Expense Rate <br />1.10 <br />Total Subconsultant Fee <br />$ 9,350 <br />$ 9,350 <br />5 <br />�aarca e oee e� <br />Direct / Reimbursable Expenses �\aaoa owe\ ao�Q 0oa Oc `fie <br />a`e <br />e <br />t <br />Task Description <br />Miles <br />Nights <br />Lsum <br />Ea <br />Lsum <br />Total Sub Exp <br />Topographic Survey <br />1,650 <br />3 <br />$ 250 <br />$ 1,780 <br />Location Control Route Survey <br />418 <br />1 <br />420 <br />$ 628 <br />Design Plans - Meetings w/ City and Site Visits <br />582 <br />$ 407 <br />
The URL can be used to link to this page
Your browser does not support the video tag.