Laserfiche WebLink
Client: City of South Bend <br />Project Name: Lathrop Watermain and Street Reconstruction From Bendix to Portage �► <br />Project No.: 25-2171 A&Z ENGINEERING <br />¢a ¢� ¢A <br />¢ e ¢a ¢e oa . Ac a . xc et <br />Manhour Justification c�Q� tQ4I <br />¢° <br />Task Description <br />Totals <br />Total Fee <br />50 % Design Submission <br />0 <br />0 <br />200 <br />302 <br />506 <br />0 <br />0 <br />0 <br />0 <br />1008 <br />$ 144,100 <br />32 Title Sheet <br />2 <br />4 <br />$ 860 <br />33 Index Sheet with Pertinent Utility Information <br />2 <br />4 <br />6 <br />$ 1,710 <br />34 Typical Cross Sections / 1 shts <br />2 <br />2 <br />8 <br />$ 1,690 <br />35 Maintenance of Traffic - Road Closed / Detour Signage (1 "=500') / 2 Sint <br />4 <br />24 <br />48 <br />1 <br />$ 10,600 <br />36 Plan and Profile (1" = 20') / 7 Shts <br />8 <br />80 <br />120 <br />$ 29,080 <br />37 Plan and Profile (1" = 20') / 7 Side Streets / 2 Shts <br />6 <br />20 <br />32 <br />$ 8,180 <br />38 Construction Details Shts (Curb ramps, Intxn) / 2 Shts <br />6 <br />12 <br />24 <br />$ 5,940 <br />39 Finalize Drainage Design <br />4 <br />8 <br />16 <br />$ 3,960 <br />40 Finalize Gridsmart Signal Design <br />0 <br />0 <br />0 <br />$ - <br />41 Cross -Section Sheets / 17 Shts <br />12 <br />36 <br />60 <br />$ 15,240 <br />42 Pavement Marking and Signage (1" = 40') / 4 Shts <br />2 <br />4 <br />16 <br />$ 3,060 <br />43 Structure Data / Underdrain Table <br />2 <br />4 <br />4 <br />$ 1,440 <br />44 Pavement Qtys/Approach Table <br />2 <br />4 <br />16 <br />$ 3,060 <br />45 Erosion Control Plans (1 "= 40') / 4 Shts+ 2 detail Shts <br />2 <br />12 <br />36 <br />$ 6,920 <br />46 Waterrnain Details/ 1 Sint <br />2 <br />4 <br />16 <br />$ 3,060 <br />47 Standard/ Miscellaneous Details / 1 Shts <br />1 <br />2 <br />4 <br />8 <br />$ 1,980 <br />48 Permit Application- CSGPIDEMPermit <br />16 <br />$ 2,560 <br />49 Permit Application- IDEM Water Main Const Permit <br />12 <br />4 <br />$ 2,460 <br />50 Specifications <br />32 <br />8 <br />$ 6,200 <br />51 Utility Coordination (early contact, Plan submission, Conflict Analysis) <br />6 <br />56 <br />$ 9,080 <br />52 Geotech Subconsultant Coordination (GME) <br />16 <br />0 <br />$ 2,560 <br />53 Qy Calcs and Cost Est <br />4 <br />4 <br />32 <br />$ 5,540 <br />54 QA/QC time <br />40 <br />$ 6,400 <br />55 Mtg - City review / Site Visit <br />8 <br />8 <br />$ 2,360 <br />56 Compliance City Review at 50 % Review <br />8 <br />24 <br />40 <br />$ 10,160 <br />