Laserfiche WebLink
REGULAR MEETING JULY 8, 2025 144 <br />recommendation be accepted, and the quotation be awarded, and the contract approved as outlined <br />above. Mr. Miller seconded the motion, which carried by roll call. <br />AWARD QUOTATION AND APPROVE CONTRACT — STORM DRAIN AND SIDEWALK <br />REPAIR — (ACCT: 641-06-605-514-436001) <br />Chip Enos, Wastewater, advised the Board that in June, quotations were received and opened for <br />the above referenced project. After reviewing those quotations, Mr. Enos recommended that the <br />Board award the contract to the lowest responsive and responsible quoter, TX Concrete LLC, in <br />the amount of $1,525.75. Therefore, VP Molnar made a motion that the recommendation be <br />accepted, and the quotation be awarded, and the contract approved as outlined above. Mr. Miller <br />seconded the motion, which carried by roll call. <br />APPROVAL OF REQUEST TO REJECT BIDS/QUOTATIONS — SOUTH WELL FIELD, <br />WATER TREATMENT PLANT, AND DISTRIBUTION SYSTEM IMPROVEMENTS — BID <br />PACKAGE 1 — PROJECT NO. 117-059A (SOUTHSIDE TIF AND WATER CAPITAL FUND) <br />In a memorandum to the Board, Jacob Klosinski, requested permission to reject all bids for the <br />above referenced project due to incomplete bid and exceeding the available budget. Therefore, <br />upon a motion made by VP Molnar, seconded by Mr. Miller and carried by roll call, the above <br />request was approved. <br />APPROVE CHANGE ORDER NO. 3 — BERCLIFF ESTATES SEWER SEPARATION — <br />PROJECT NO. 122-016 (PO-0028224) <br />President Maradik advised that Rebecca Plantz, Engineering, has submitted change order number <br />3 on behalf of Milestone Contractors, L.P., indicating the contract amount be increased by <br />$14,700.85 for a new contract sum, including this change order, in the amount of $752,055.36. <br />Upon a motion made by VP Molnar, seconded by Mr. Miller and carried by roll call, the change <br />order was approved. <br />APPROVE CHANGE ORDER NO. 2 — ND-DTSB TRAIL — NOTRE DAME AVE. — PROJECT <br />NO. 122-040A (PO-0030356) <br />President Maradik advised that Charlie Brach, Engineering, has submitted change order number 2 <br />on behalf of Milestone Contractors, L.P., indicating the contract amount be increased by <br />$38,739.92 and an additional two hundred and ten days for a new contract sum, including this <br />change order, in the amount of $5,623,247.37 with a new completion date of May 23, 2025. Upon <br />a motion made by VP Molnar, seconded by Mr. Miller and carried by roll call, the change order <br />was approved. <br />APPROVE TITLE SHEET —KENNEDY ACADEMY- SAFE ROUTES TO SCHOOL (INDOT-LPA) <br />— PROJECT #123-017 (DES#2201237) <br />Ms. Gemma Stanton, Engineering, advised that one (1) title sheet for the above referenced project was <br />being presented at this time for execution. Upon a motion made by VP Molnar, seconded by Mr. Miller <br />and carried by roll call, the above referenced title sheet was approved and signed <br />APPROVAL OF REQUEST TO ADVERTISE FOR THE RECEIPT OF BIDS — 2025 <br />NEIGHBORHOOD SERVICES & ENFORCEMENT DEMOLITIONS — PROJECT NO. 125- <br />043 (PR-00041906) <br />In a memorandum to the Board, Zach Hurst, Engineering, requested permission to advertise for <br />the receipt of bids for the above referenced project. Therefore, upon a motion made by VP Molnar, <br />seconded by Mr. Miller and carried by roll call, the above request was approved. <br />APPROVAL OF REQUEST TO ADVERTISE FOR THE RECEIPT OF BIDS — CLEANUP OF <br />SOUTH BEND RANGE, PHASE I — BUILDING DEMOLITION — PROJECT NO. 125-020A <br />(PR-00041901) <br />In a memorandum to the Board, Zach Hurst, Engineering, requested permission to advertise for <br />the receipt of bids for the above referenced project. Therefore, upon a motion made by VP Molnar, <br />seconded by Mr. Miller and carried by roll call, the above request was approved. <br />