My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Plans for the O'Brien Park Splashpad and Restroom Proj No 125-025 - Abonmarche
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Plans for the O'Brien Park Splashpad and Restroom Proj No 125-025 - Abonmarche
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 3:01:45 PM
Creation date
7/22/2025 3:00:17 PM
Metadata
Fields
Template:
Board of Public Works
Document Date
7/22/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
O'Brien Park Improvements <br />A/E Scope of Services <br />June 20, 2025 <br />Page 2 of 6 <br />8. Lead and oversee Project Coordination Meetings: <br />a. One (1) Pre -Design Owner -Architect meeting ("kickoff"); <br />b. Two (2) Design Coordination meetings with Owner. <br />Landscape / Site Design <br />1. Development of two (2) preliminary site layout concepts for Owner consideration, <br />including: <br />a. New (Replacement) Splash Pad/equipment concept; <br />b. New (Replacement) Playground area/equipment concept and locations; <br />c. New walks, including general connectivity and wayfinding concepts; <br />d. Parking, vehicular access and safety improvement concepts; <br />e. New Comfort Station locations; <br />f. New site furniture, lighting and planting concepts / locations. <br />2. Preliminary coordination with specialty splash pad and playground equipment <br />manufacturers/suppliers for concept design, equipment selection and budgeting. <br />3. Refinement of one (1) site layout concept to 30% design completion level, including <br />preliminary grading and conceptual stormwater/drainage. <br />Civil / Utility Engineering <br />1. Topographic survey of project area, including marked public utilities. <br />a. Assumes Owner -identified / marked utilities. <br />2. (Limited) Assessment of existing on -site utilities, including on -site sewage disposal. <br />a. Assumes Owner -provided existing utility information and locations; <br />b. Assumes on -site sewage system to be abandoned as part of the project. <br />3. Preliminary coordination with specialty splash pad manufacturers/suppliers for utility <br />design coordination matters, including water supply and sewer requirements. <br />4. Preliminary site utility design concepts including stormwater conveyance, sanitary sewer <br />improvements and public water service. <br />Architecture <br />Conceptual design of four (4)-stall public -access restroom facility for Owner <br />consideration. <br />a. Assumes two (2) stalls per gender, fully -accessible; <br />i� <br />
The URL can be used to link to this page
Your browser does not support the video tag.