Laserfiche WebLink
O'Brien Park Improvements <br />A/E Scope of Services <br />June 20, 2025 <br />Page 3 of 6 <br />b. Inclusion of an extended roof feature for added protection from the elements. <br />2. Prepare Schematic Design Documents for the Owner's approval, consisting of drawings <br />and other documents including preliminary building plans, sections and elevations; and <br />may include some combination of study models, perspective sketches, or digital <br />representations. <br />3. Preliminary selections of major building systems and construction materials. <br />i� <br />