My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Design of North Water Treatment Plant for PFAS Minimization - Black & Veatch
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Design of North Water Treatment Plant for PFAS Minimization - Black & Veatch
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 3:00:01 PM
Creation date
7/22/2025 2:58:16 PM
Metadata
Fields
Template:
Board of Public Works
Document Date
7/22/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
g. Preliminary Drawings and Specification List <br />2. The following preliminary drawings will be included as an appendix to the BDR: <br />a. General <br />b. Sheet List <br />c. Site Plan <br />d. Hydraulic Profile <br />e. Process Flow Diagram <br />f. Facility Demolition Plan <br />g. Facility New Equipment and Piping Plan <br />h. Electrical Power Distribution Functional Diagram <br />i. P&IDs <br />3. Provide one electronic copy (PDF) of the Draft BDR and preliminary drawings to Owner <br />for distribution and review. <br />4. Attend one (1) 2-hr meeting with Owner to receive and discuss Owner's review comments. <br />For budgeting purposes, meeting will be held at the Owners office and will be attended in - <br />person by Engineering Manager and Project Engineer and virtually by all other disciplines. <br />5. Owner comments will be received and incorporated into a Final BDR to be submitted after <br />the review meeting. <br />TASK 400 — DETAILED DESIGN <br />1. Prepare construction contract documents for one construction contract. <br />2. The construction contract documents shall be prepared for selection of private construction <br />contractors on a competitive bid basis. <br />3. This expedited design format has only Level 2 (50%) and Level 3 (90%) submittals. No <br />Level 1 (30%) submittal is provided. <br />4. Design — General <br />a. As part of the Basic Design Services, the Engineer shall produce interim documents for <br />the purpose of review by Owner's staff and Engineer's quality control. The interim <br />documents shall serve as milestones wherein certain features shall be fixed after a <br />period of Owner review. The purpose of the interim documents and fixing certain <br />features shall be to communicate the design progress and avoid later revisions that <br />Page 4 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.