My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Design of North Water Treatment Plant for PFAS Minimization - Black & Veatch
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Design of North Water Treatment Plant for PFAS Minimization - Black & Veatch
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 3:00:01 PM
Creation date
7/22/2025 2:58:16 PM
Metadata
Fields
Template:
Board of Public Works
Document Date
7/22/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
would impact design efficiency and Project cost and schedule. Changes made after <br />fixing features will be considered Supplemental Services. <br />b. As part of the Design Services, Engineer may develop Opinions of Probable <br />Construction Cost (OPCC), as indicted in Task 405. All OPCC developed will follow <br />the recommendations of the Association for the Advancement of Cost Engineering <br />(AACE) International Recommended Practice No. 18R and accepted industry <br />guidelines with regard to methodology and accuracy. Since Engineer has no control <br />over the cost of labor, material, or equipment furnished by others not under contract to <br />Engineer, Engineer's opinion of probable cost for construction of the work will be <br />made on the basis of experience and qualifications as an Engineer. Engineer does not <br />guarantee or warranty that proposals, bids, or actual project costs will not vary from <br />Engineer's opinions of probable cost. <br />c. Drawings will be prepared based on Engineer's drafting standards on 24" x 36" size <br />sheets. The Owner's applicable standard details available and current at the time of the <br />work will be utilized. Where applicable Owner standard details are not available, <br />Engineer's standard details will be utilized. The technical specifications will be based <br />on Engineer's standards and customized for the project. <br />d. Owner -Furnished Front -End Documents — Obtain and edit Owner -furnished front-end <br />documents, general conditions, special conditions, standard specifications, and standard <br />details. <br />Task 401— 50% Detailed Design <br />1. Detailed design is to commence only after Owner has accepted design criteria and the Basis <br />of Design Memorandum. Level 2 progress review meeting deliverables are as follows: <br />a. City of South Bend front-end documents, Div 0 (BV edited) <br />b. BV Division 01 Specifications <br />c. Major Equipment Specifications <br />d. Site plan <br />e. Hydraulic Profile <br />f. Process Flow Diagram <br />g. Primary systems P&ID drawings <br />h. Chemical feed system P&ID drawings <br />i. Secondary systems P&ID drawings <br />j. Equipment control descriptions <br />Page 5 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.