My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GESC for Olive WTP Solar Proj No 124-050 - Ameresco
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
GESC for Olive WTP Solar Proj No 124-050 - Ameresco
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 2:56:29 PM
Creation date
7/22/2025 2:55:09 PM
Metadata
Fields
Template:
Board of Public Works
Document Date
7/22/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
# <br />Service Area/Item Description <br />BASIC <br />ADDITIONAL SYSTEM <br />SYSTEM <br />SERVICES <br />Dispatch to technicians for Corrective Actions. <br />■ <br />2.6 <br />Dispatch times and details as per Contract <br />Ongoing <br />Documents <br />2.7 <br />Communications with Utility <br />Ongoing <br />2.8 <br />Remote system analysis <br />Ongoing <br />Pr 3 <br />Operation Reporting <br />Owner will be provided remote web access to <br />Operator's CAMS to view all testing, inspection <br />and preventative <br />3.1 <br />maintenance performed, all site equipment details, <br />Ongoing <br />g g <br />all service reports, and performance data <br />Work Order Reports — A detailed report that <br />3.2 <br />includes time, date, technician, work performed <br />Ongoing <br />and photos. <br />Quarterly Reporting <br />Environmental issues, Safety Issues, Work Order <br />3.4 <br />Summary and a Production Table that includes <br />Quarterly <br />QTD and YTD Actual to Forecast and Actual to <br />Weather -Adjusted. <br />Annual Reporting <br />Digital checklist of all items detailed in the Scope <br />of Work below, including photos, pass/fail, when <br />fail, a description of the issue and whether or not <br />it was repaired while on site and a summary of <br />corrective actions required after the inspection <br />with detailed pricing to make recommended <br />repairs. <br />3.5 <br />Annually <br />Record Keeping <br />Perform comprehensive record keeping of all <br />relevant project documentation provided by <br />customer and generated by Operator including, <br />but not limited to, as- built drawings, equipment <br />specifications, safety manuals, detailed <br />maintenance and repair logs, preventative <br />maintenance logs, Owner Inventory and <br />equipment <br />operating manuals. <br />3.6 <br />Ongoing <br />4 <br />PV Modules <br />Aerial Th erm a I Imaging: <br />Confidential & Proprietary Information of Ameresco, Inc. Page 48 of 56 <br />
The URL can be used to link to this page
Your browser does not support the video tag.