My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GESC for Olive WTP Solar Proj No 124-050 - Ameresco
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
GESC for Olive WTP Solar Proj No 124-050 - Ameresco
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 2:56:29 PM
Creation date
7/22/2025 2:55:09 PM
Metadata
Fields
Template:
Board of Public Works
Document Date
7/22/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PV SOLAR SCOPE OF SERVICES AND CHECKLIST <br /># <br />Service Area/Item Description <br />BASIC <br />ADDITIONAL SYSTEM <br />SYSTEM <br />SERVICES <br />1 <br />Environmental, Health and Safety (EHS) <br />Ensure that all regulatory required <br />policies/procedures/plans are written, certified <br />1.1 <br />when applicable, and maintained for the Site as <br />Ongoing <br />required. <br />Operator will submit all health and safety reports <br />to Customer, or its Affiliates governmental <br />authorities <br />1.2 <br />required from the Operator as it pertains to the <br />Ongoing <br />g g <br />asset(s) for which Operator provides Services. <br />Allow Customer or Customer's representative to <br />access the site. Customer and/or its representative <br />shall follow the Project's safety procedures, <br />including use of appropriate PPE, and calling <br />Operator's Remote <br />Operations Control Center prior to entering site <br />Ameresco chaperone, if <br />and when leaving site. <br />required <br />1.3 <br />Ongoing <br />All safety, environmental and emergency response <br />equipment must be maintained by Operator <br />throughout the Term. This includes but is not <br />limited to fire extinguishers, spill kits, PPE, <br />eyewash & shower stations, etc. Response <br />equipment not on -site at hand over to Operator <br />may be provided as an Additional Service. Re- <br />1.4 <br />charging or re -stocking of emergency response <br />Ongoing <br />equipment used in response to an emergency <br />event will be billed as an Additional Service. <br />2 <br />System Monitoring, Alarm Response & System Analysis <br />Owner to supply Operator with administrative <br />rights to Owner's Data Acquisition System. <br />Included in pricing is an allowance of four hours <br />per project for onboarding and set-up of Owner's <br />DAS. Additional hours, if required, shall <br />be billed at the Project Management Rate. <br />2.1 <br />Ongoing <br />As noted <br />2.2 <br />Active monitoring 24 hours per day, 365 days per <br />Ongoing <br />g g <br />year <br />2.3 <br />Alarm Notification <br />Ongoing <br />2.4 <br />Remote Corrective Diagnostics <br />Ongoing <br />2.5 <br />Remote Power Plant Operation when available <br />Ongoing <br />Confidential & Proprietary Information of Ameresco, Inc. Page 47 of 56 <br />
The URL can be used to link to this page
Your browser does not support the video tag.