My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GESC for Olive WTP Solar Proj No 124-050 - Ameresco
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
GESC for Olive WTP Solar Proj No 124-050 - Ameresco
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 2:56:29 PM
Creation date
7/22/2025 2:55:09 PM
Metadata
Fields
Template:
Board of Public Works
Document Date
7/22/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Service Area/Item Description <br />BASIC <br />ADDITIONAL SYSTEM <br />SYSTEM <br />SERVICES <br />Perform, or cause to be performed, aerial infrared <br />("IR") thermal imaging of the Project to identify <br />sub -module, module and string -level performance <br />deficiencies. <br />Operator shall evaluate the IR imaging results and <br />provide a detailed report with its findings <br />including, but not limited to, a site plan displaying <br />faults/issues and a summary of the faults/issues <br />found, their location, and loss impact of non- <br />compliant equipment. Corrective action to <br />remediate deficiencies found during the imaging <br />audit will be subject to Customer's approval and <br />performed by Operator as Additional Services. For <br />systems less than 500 KWP DC, Operator may <br />elect to perform 100% IV Curve Tracing in lieu of <br />Aerial Thermal Imaging. <br />4.1 <br />Annually <br />Corrective Actions <br />Module Inspection, Front <br />Inspect front of modules for broken glass, <br />4.2 <br />delamination, yellowing or browning, burnt or <br />Annually <br />oxidized cell, or cracks in cells. <br />Module Inspection, Frame <br />4.3 <br />Inspect module frames for damage or <br />Annually <br />misalignment <br />Module Inspection, Back <br />Inspect back of modules for delamination or burnt <br />marks. For roof -top systems, underside of module <br />inspection will occur on modules that are readily <br />accessible, such as the <br />4.4 <br />end of each row, or where it is apparent there is or <br />Annually <br />very well could be an issue. <br />Module Inspection, J-Box <br />4.5 <br />Inspect junction boxes for loose attachment, <br />Annually <br />evidence of overheating and corrosion <br />Module Inspection, Connector <br />4.6 <br />Inspect wire connectors for detachment, evidence <br />Annually <br />of overheating and exposed electrical parts. <br />Module, Cleaning <br />Perform, or cause to be performed, cleaning of <br />4.7 <br />100% of the PV modules following manufacturer's <br />Additional System <br />As needed and approved by <br />recommendations as needed and approved by <br />Service. <br />owner <br />owner as <br />Confidential & Proprietary Information of Ameresco, Inc. Page 49 of 56 <br />
The URL can be used to link to this page
Your browser does not support the video tag.