My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GESC for Olive WTP Solar Proj No 124-050 - Ameresco
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
GESC for Olive WTP Solar Proj No 124-050 - Ameresco
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 2:56:29 PM
Creation date
7/22/2025 2:55:09 PM
Metadata
Fields
Template:
Board of Public Works
Document Date
7/22/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
utility should they require upgrades to their system to accommodate the solar system <br />interconnection. <br />9. Furnish and install APA Solar Racking Ready Rack (or equal) mounting system. <br />10. Aluminum conductor will be used except for grounding and the interconnection. <br />11. Underground conduit shall be run from the array to the interconnection point. Conduit underground <br />shall be Schedule 40 PVC. Conduits transitioning to and from the underground PVC shall be RMC. <br />12. Low grow grass seeds will be planted within the array. <br />13. Interconnection may occur on Saturday and will be coordinated with the Customer to minimize <br />disruptions. <br />14. 4.3% of the contract value will be performed by women owned businesses) and 1.1% of the contract <br />value will be performed by minority owned business(es). <br />General Scope of Services Comments: <br />• Unless specifically noted in the Scope of Services — abatement of ACM and other hazardous materials <br />is excluded. <br />• As final engineering is not started and equipment is not ordered until Ameresco has a signed contract <br />/ notice to proceed - Ameresco cannot guarantee delivery dates / system start-up and is not responsible <br />for costs associated with additional mobilizations, temporary equipment, etc. if long lead times affect <br />construction schedule. <br />• Material ordering and final scheduling will not occur until a signed agreement is received. <br />• Ameresco pricing assumes 100% availability of the project area to do the work. Unless noted <br />otherwise, pricing based on first shift only (Monday through Friday). <br />• Piping / conduit / wire mold may be run exposed in occupied spaces (as applicable). <br />• Unless specifically noted in the Scope of Services — conduit / wire mold is un-painted. <br />• Based on the existing drawings, it is assumed that there are no underground utilities are in the area of <br />the array. <br />Exclusions: <br />• Union labor and/or prevailing wage rates <br />• Apprentices Labor <br />• Copper conductor <br />• Tariffs imposed or changes required due to changes in law after the date of contract execution <br />• Lighting or security cameras <br />• Domestic content per the ITC definition <br />• Utility service upgrades or other electrical infrastructure upgrades including harmonic distortion <br />remediation <br />• Excludes lightning protection system design, modification and/or installation. <br />• Design changes due to underground utilities within the array field. <br />• Backup power during the utility shutdown for interconnection <br />• Operations & Maintenance of the system <br />Confidential & Proprietary Information of Ameresco, Inc. Page 24 of 56 <br />