My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No. 2 to PSA - Coal Line Trail Proj No 123-007 - Lochmueller Group
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No. 2 to PSA - Coal Line Trail Proj No 123-007 - Lochmueller Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2025 1:19:00 PM
Creation date
7/8/2025 1:18:58 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/8/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND PAGE 1 OF 3 AMENDMENT NO. 2 <br />\\LOCH.LOC\ROOT\CORPORATE\PRIVATE\ACCOUNTING DATA\CONTRACTS\SOUTH BEND\123-3013-00H COAL LINE TRAIL PHASE 3\SOUTH BEND\AM 2\2025-06-09 AM 2 WITH CITY.DOCX 123-3013-00H <br /> A MENDMENT N O . 2 <br />THIS AMENDMENT NO. 2 IS MADE AND ENTERED INTO THIS 8th DAY OF JULY, 2025 BY AND <br />BETWEEN CITY OF SOUTH BEND, HEREINAFTER REFERRED TO AS “LPA” AND <br />LOCHMUELLER GROUP, INC., HEREINAFTER REFERRED TO AS “CONSULTANT”. <br />WI T N ES S ET H <br />WHEREAS, LPA and CONSULTANT did on November 28, 2023 enter into a Contract to provide <br />services for Coal Line Trail, Phase 3, Engineering services and design of a multi-use path and urban <br />design features., and <br />WHEREAS, the LPA desires to delete the signal scope from the Contract, and <br />WHEREAS, the LPA desires to add design scope to remove the bumpouts at the intersections and <br />adjust the typical section, and <br />WHEREAS, LPA desires the CONSULTANT to provide the additional services required, and <br />WHEREAS, the CONSULTANT has expressed an interest in providing the additional required <br />services, and <br />WHEREAS, in order for the CONSULTANT to provide the additional services, it is necessary to <br />amend the original Contract, and <br />NOW, THEREFORE, it is agreed by and between both parties that the original Contract be <br />amended as follows: <br />I.Item 5.0 TRAFFIC SIGNAL DESIGN is deleted. <br />II.Item 2.3 is added to Appendix “A” as follows: <br />2.3 Prepare design scope that reflects the removal of the bumpouts at the <br />intersections and adjust the typical section. <br />III.Item 1.0 AMOUNT OF PAYMENT of Appendix “D” is replaced in its entirety with the <br />following: <br />1.0 AMOUNT OF PAYMENT <br />1.1 The CONSULTANT shall receive compensation for providing such professional <br />services under Appendix “A” of this Contract in the amount of a total fee not-to- <br />exceed Three Hundred Sixty-One Thousand Three Hundred Thirty-Six Dollars <br />($361,336.00), unless an amendment to this Contract is executed by the parties <br />that increases the maximum amount payable. <br />1.2 The CONSULTANT shall be paid for the work performed under Item 1.0, 2.0, 3.0, <br />4.0, 5.0, 6.0, 7.0, 8.0, and 9.0 of Appendix “A” of this Contract on a lump sum basis, <br />in accordance with the following lump sum fee schedule:
The URL can be used to link to this page
Your browser does not support the video tag.