My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No. 2 to PSA - Coal Line Trail Proj No 123-007 - Lochmueller Group
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No. 2 to PSA - Coal Line Trail Proj No 123-007 - Lochmueller Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2025 1:19:00 PM
Creation date
7/8/2025 1:18:58 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/8/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND PAGE 2 OF 3 AMENDMENT NO. 2 <br />\\LOCH.LOC\ROOT\CORPORATE\PRIVATE\ACCOUNTING DATA\CONTRACTS\SOUTH BEND\123-3013-00H COAL LINE TRAIL PHASE 3\SOUTH BEND\AM 2\2025-06-09 AM 2 WITH CITY.DOCX 123-3013-00H <br />1.2.1 Topographic Survey Data Collection ........................................... $38,136.00 <br />1.2.2 Urban Trail Design and Plans .................................................... $137,600.00 <br />1.2.3 Decorative Lighting Design ......................................................... $21,600.00 <br />1.2.4 Project Management .................................................................. $20,000.00 <br />1.2.5 Environmental Documentation .................................................. $65,700.00 <br />1.2.6 Permitting ..................................................................................... $8,900.00 <br />1.2.7 Utility Coordination..................................................................... $26,400.00 <br />1.3 The CONSULTANT shall be paid for the work performed under Items 10.0 and 12.0 <br />of Appendix “A” of this Contract on an hourly rate basis based on the rates set <br />forth in Exhibit “1”, attached hereto and incorporated herein by reference and in <br />accordance with the following not to exceed fee schedule: <br />1.3.1 Public Involvement ..................................................................... $13,200.00 <br />1.3.2 Construction Phase Services ....................................................... $12,200.00 <br />1.4 The CONSULTANT shall receive payment for Title Search Services performed under <br />Item 11.0 of Appendix “A” of this Contract based on the specific cost per unit <br />multiplied by the actual units of work performed in accordance with the following <br />schedule: <br />1.4.1 Title Reports (32 parcels @ $550 each) ...................................... $17,600.00 <br />Except as herein modified, changed, and amended, all terms and conditions of the original <br />Contract dated November 28, 2023 and Amendment No. 1 dated September 10, 2024, shall <br />continue in full force and effect. <br />This Amendment No. 2 neither increases or decreases the previous not-to-exceed fee of <br />$361,336.00.
The URL can be used to link to this page
Your browser does not support the video tag.