Laserfiche WebLink
CITY OF SOUTH BEND PAGE 2 OF 3 AMENDMENT NO. 2 <br />\\LOCH.LOC\ROOT\CORPORATE\PRIVATE\ACCOUNTING DATA\CONTRACTS\SOUTH BEND\123-3013-00H COAL LINE TRAIL PHASE 3\SOUTH BEND\AM 2\2025-06-09 AM 2 WITH CITY.DOCX 123-3013-00H <br />1.2.1 Topographic Survey Data Collection ........................................... $38,136.00 <br />1.2.2 Urban Trail Design and Plans .................................................... $137,600.00 <br />1.2.3 Decorative Lighting Design ......................................................... $21,600.00 <br />1.2.4 Project Management .................................................................. $20,000.00 <br />1.2.5 Environmental Documentation .................................................. $65,700.00 <br />1.2.6 Permitting ..................................................................................... $8,900.00 <br />1.2.7 Utility Coordination..................................................................... $26,400.00 <br />1.3 The CONSULTANT shall be paid for the work performed under Items 10.0 and 12.0 <br />of Appendix “A” of this Contract on an hourly rate basis based on the rates set <br />forth in Exhibit “1”, attached hereto and incorporated herein by reference and in <br />accordance with the following not to exceed fee schedule: <br />1.3.1 Public Involvement ..................................................................... $13,200.00 <br />1.3.2 Construction Phase Services ....................................................... $12,200.00 <br />1.4 The CONSULTANT shall receive payment for Title Search Services performed under <br />Item 11.0 of Appendix “A” of this Contract based on the specific cost per unit <br />multiplied by the actual units of work performed in accordance with the following <br />schedule: <br />1.4.1 Title Reports (32 parcels @ $550 each) ...................................... $17,600.00 <br />Except as herein modified, changed, and amended, all terms and conditions of the original <br />Contract dated November 28, 2023 and Amendment No. 1 dated September 10, 2024, shall <br />continue in full force and effect. <br />This Amendment No. 2 neither increases or decreases the previous not-to-exceed fee of <br />$361,336.00.