Laserfiche WebLink
E d ww d 11W Wit e 6 In e 6 <br />Plumbing ■ Heating • .Air Conditioning • Boilers <br />Commercial • Residential ■ Industrial <br />March 7, 2025 <br />Larson -Danielson Construction <br />Attn: Dave Merkel <br />302 Tyler St. <br />LaPorte, IN 46350 <br />Job: Raclin Murphy Encore Center South Bend Indiana <br />Re: Request for Quote - CCD 9 Sump Pump. <br />Mr. Merkel: <br />Per your request, please see the following pricing breakdown for the cost of the additional material and labor for <br />CCD 9 Sump Pump. <br />The costs break down as follows: <br />• Edward J. White Labor Total: $10,424.00 <br />0 100 Journeyman Hours x $98.00/Hour = $9,800.00 <br />o 06 Foreman Hours x $104.00/Hour = $624.00 <br />• Edward J. White Material Total: $890.00 <br />• Edward J. White Material Plus Markup (+10% Gross): $989.00 <br />• Edward J. White Subs <br />o United Rentals — 6,4001b Mini Excavator = $1524.58 <br />o Indiana Concrete Cutting — 2 holes cored = $700.00 <br />• Edward J. White Subs Total = $2,224.58 <br />• Edward J. White Subs Plus Markup (+10% Gross): $2472.00 <br />Grand Total: $13,885.00 <br />Please Note: I have not included floor cutting or coring the hole for the sump pit. Larson - Daniels is responsible for <br />that scope of work as discussed. <br />Please contact our office with any questions or to proceed with this work. <br />Respectfully submitted; <br />Edward J. White, Inc. <br />Adam Smith <br />Project Manager/Estimator <br />iOE VA <br />1' 1011 South Michigan Street ■ South Send, IN 46601 T <br />Phone: (574) 289-6351 • Fax: (574) 289-3755 BBB, <br />www.ejwhiteinc.net <br />Licensed— Bonded— Insured IN License #C'81021273 <br />