My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 3 - Raclin Murphy Encore Center Proj No 123-056 - Larson Danielson
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Change Orders
>
Change Order No. 3 - Raclin Murphy Encore Center Proj No 123-056 - Larson Danielson
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2025 12:41:11 PM
Creation date
6/10/2025 11:55:58 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/10/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
10LARSON <br />DMA 411; LSON <br />ComDuc[ivn Cargwry, Inc. <br />To: Matt Puckett <br />SHIVE-HATTERY <br />321 SOUTH MAIN STREET, <br />SUITE 103 <br />SOUTH BEND, IN 46601 <br />Ph:(574)307-9990 <br />Description: CCD 9 Sump Pump <br />302 Tyler Street <br />LaPorte, IN 46350 <br />Ph : 219-362-2127 <br />Change Request <br />Number: 22 <br />Date: 1 /20/25 <br />Job: 56-702 SIB PUB WRKS-RCLN MRPHY ENCORE <br />Phone: <br />We are pleased to offer the following specifications and pricing to make the following changes <br />PROVIDED SUMP PUMP IN BASEMENT ADJACENT TO THE STAIR BETWEEN GRIDLINE FAND E.7. MOVE THE FURRING <br />WALL OUT AN ADDITIONAL 2'+- TO ALLOW ROOM FOR SUMP PUMP SEE ATTACHED CCD9-SK1 FOR LOCATION AND <br />ADDITIONAL INFORMATION. CORE DRILLAT FOUNDATION AND FOUNDATION WALL PER STRUCTURAL REQUIREMENTS, <br />SEE CCD9-SK1, AND S-100. SEE REVISED PLUMBING DRAWINGS FOR ROUTING AND PLUMBING WORK. <br />Description Labor <br />Material Equipment <br />Subcontract <br />Other <br />Price <br />Plumbing - EJ White <br />$13,885.00 <br />$13,885.00 <br />Electrical - Pemberton -Davis <br />$688.00 <br />$688.00 <br />Drywall - Kleckner Interior <br />$883.00 <br />$883.00 <br />Painting & Wall Covering - Stan's Painting <br />$240.00 <br />$240.00 <br />Core Drill for Sump <br />$940.00 <br />$940.00 <br />Core Drill for Foundation Drain (LD) $256.00 <br />$256.00 <br />Penetration thru Base of Wall - Labor <br />Core Drill for Foundation Drain (LD) <br />$520.00 <br />$520.00 <br />Penetration thru Base of - Equipment <br />Subtotal: <br />$17,412.00 <br />OH&P Labor <br />$256.00 <br />19.92% <br />$51.00 <br />OH&P Material <br />$0.00 <br />OH&P Equipment <br />$520.00 <br />11.92% <br />$62.00 <br />Subcontractor First 3K <br />$3,000.00 <br />10.00% <br />$300.00 <br />Subcontractor After3K <br />$13,636.00 <br />7.00% <br />$955.00 <br />Bond Markup <br />$18,780.00 <br />1.00% <br />$188.00 <br />Total: <br />$18,968.00 <br />If you have any questions, please contact me at (219)575-6115. <br />Submitted by: David J. Merkel <br />LARSON-DANIELSON CONST. CO INC <br />Approved by: <br />Date: <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.