My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Drewry's Brewery Cleanup, Phase III Proj No 119-031E - DLZ Indiana
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Drewry's Brewery Cleanup, Phase III Proj No 119-031E - DLZ Indiana
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2025 1:54:53 PM
Creation date
5/13/2025 1:54:28 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />Proposal for Environmental & Site-Civil <br />Engineering on the Former <br />Drewry’s Brewery Parcel <br />Page 14 of 19 <br /> <br /> <br /> <br /> <br />B. Provide all criteria and full information as to CLIENT’s requirements for the Project, including <br />design objectives and constraints, space, capacity and performance requirements, flexibility and <br />expandability, and any budgetary limitations. <br /> <br />C. Assist DLZ by providing all available information pertinent to the Project including, but not limited <br />to, the following: <br />1. Previous reports and any other data relative to design or construction of the Project. <br />2. Utility and building plans available to the CLIENT covering the facilities. <br />3. Known soils and groundwater information from the site. <br />4. Data prepared by others and professional interpretations relating to such data. <br />5. All environmental studies possessed by the CLIENT. <br />6. Geotechnical reports or information previously conducted on the Project site. <br />7. Historical Boundary Surveys and Topographic Surveys. <br />D. As requested by DLZ, schedule meeting with decision makers from City of South Bend <br />departments, public utilities, private utilities, and other stakeholders. Ensure that the information <br />provided to DLZ is accurate and comprehensive. <br />E. CLIENT’S legal counsel shall review and approve the performance based bidding approach and <br />associated bid documents. <br />F. Arrange for access to and make all provisions for DLZ to enter upon public and private property as <br />required for DLZ to perform services under this Proposal. <br />G. Provide electricity and water as may be required by DLZ to complete the work identified by this <br />Proposal. <br />H. Provide the ability for DLZ to bag and label any personal protective clothing and disposable <br />sampling equipment generated during the sampling activities and to locate the same on the <br />CLIENT’s property for future disposal by a demolition contractor engaged by the CLIENT. <br />I. Examine all studies, reports, sketches, drawings, specifications, proposals, recommendations, and <br />other documents presented by DLZ, obtain advice of attorney, insurance counselor and other <br />consultants as CLIENT deems appropriate for such examination and provide to DLZ CLIENT”S <br />decisions pertaining thereto within a reasonable time. <br />J. Provide personnel for information gathering and quality control purposes.
The URL can be used to link to this page
Your browser does not support the video tag.