My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Drewry's Brewery Cleanup, Phase III Proj No 119-031E - DLZ Indiana
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Drewry's Brewery Cleanup, Phase III Proj No 119-031E - DLZ Indiana
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2025 1:54:53 PM
Creation date
5/13/2025 1:54:28 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />Proposal for Environmental & Site-Civil <br />Engineering on the Former <br />Drewry’s Brewery Parcel <br />Page 12 of 19 <br /> <br /> <br /> <br /> <br />6. DLZ will provide the CLIENT with a written recommendation as to which is the lowest <br />responsible and responsive bidder for the scope of work identified. <br /> <br />TASK 9 – LIMITED DEMOLITION PHASE ADMINISTRATIVE SERVICES <br /> <br />A. The Limited Demolition Phase Services are based on the following assumptions: <br /> <br />The CLIENT / Demolition Contractor agreement shall require the following: <br /> <br />1. One (1) demolition/clearing contract is included in this Project. A Project schedule with a <br />maximum duration of three (3) consecutive months, with an additional maximum one (1) <br />month period for project closeout for on-site demolition activities. <br /> <br />2. The project will be completed on a lump sum basis and may include specific unit prices and <br />allowance items established for environmental remediation. <br /> <br />3. The demolition contractor will be required to procure the services of an independent third- <br />party company to perform material testing services and As-Built survey services. Material <br />testing services include but are not limited to on-site compaction and density testing, <br />environmental abatement/remediation sampling, and laboratory analysis. All testing reports <br />and documentation shall be submitted to DLZ and the CLIENT. <br /> <br />B. At the request of the CLIENT, DLZ will provide Limited Demolition Phase Administrative Services <br />and technical support throughout the demolition phase of this Project. DLZ has included up to <br />180 hours for this task. When requested by the CLIENT, DLZ will perform the following services <br />list below: <br /> <br />1. DLZ’s project manager will attend the pre-demolition meeting and distribute meeting <br />minutes. <br /> <br />2. DLZ’s project manager will attend on-site progress meetings throughout the Project. While <br />on-site for the progress meetings, DLZ will generally observe the status of the Work to become <br />generally familiar with and to keep the CLIENT informed about the progress and quality of <br />Work completed. <br /> <br />3. DLZ will review the Demolition Contractor’s shop drawings and submittals for general <br />conformance with the Contract Documents and maintain a file of all shop drawings and <br />submissions. DLZ’s approval of Contractor submittals shall not constitute approval of <br />deviations from the Contract Documents other than deviations explicitly called out in writing
The URL can be used to link to this page
Your browser does not support the video tag.