My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Drewry's Brewery Cleanup, Phase III Proj No 119-031E - DLZ Indiana
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Drewry's Brewery Cleanup, Phase III Proj No 119-031E - DLZ Indiana
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2025 1:54:53 PM
Creation date
5/13/2025 1:54:28 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />Proposal for Environmental & Site-Civil <br />Engineering on the Former <br />Drewry’s Brewery Parcel <br />Page 11 of 19 <br /> <br /> <br /> <br /> <br />H. Bidding Quantities <br />1. The CLIENT and DLZ agree that the bidding documents will be developed such that a single <br />lump sum base bid will be solicited for the foundation demolition, utility abandonment, <br />pavement removal, earthwork, and site restoration. <br />2. DLZ may develop environmental remediation unit price items and environmental remediation <br />allowances to be incorporated into the bidding documents. <br /> <br />I. Reproduction of Project Documents <br /> <br />1. DLZ will provide up to ten hard copies and one electronic copy to the CLIENT for reproduction. <br /> <br />TASK 7 – OPINION OF PROBABLE CONSTRUCTION COSTS <br /> <br />A. Engineer’s Opinion of Probable Costs <br />1. After completing each design submittal (two total) noted in the schedule, DLZ will review the <br />collected material and information to provide to the CLIENT a more developed cost estimate. <br />This estimate will also take into account any enabling work needed to facilitate the demolition <br />and a proposed project timeline. <br /> <br />TASK 8 – BID PHASE SERVICES <br /> <br />A. Solicitation of Bids – Demolition and Site Clearing Contract <br />1. One (1) bid package is included in this Project. DLZ will assist the CLIENT to solicit bids for the <br />Project. <br />2. DLZ will prepare a pre-bid meeting agenda and handouts, conduct the pre-bid meeting, and <br />assist with the pre-bid walk-through. <br />3. DLZ will develop and issue the pre-bid meeting minutes in the form of a written addendum. <br />4. DLZ will answer bidder questions relative to the scope of work identified in the form of a <br />published addendum(s). <br />5. DLZ will attend the bid openings and assist in the review of all bids.
The URL can be used to link to this page
Your browser does not support the video tag.