My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Drewry's Brewery Cleanup, Phase III Proj No 119-031E - DLZ Indiana
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Drewry's Brewery Cleanup, Phase III Proj No 119-031E - DLZ Indiana
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2025 1:54:53 PM
Creation date
5/13/2025 1:54:28 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />Proposal for Environmental & Site-Civil <br />Engineering on the Former <br />Drewry’s Brewery Parcel <br />Page 10 of 19 <br /> <br /> <br /> <br /> <br />G. Bid Document Submittals <br /> <br />1. Preliminary Demolition Documents. <br /> <br />a. DLZ will prepare 60% Demolition Documents for the CLIENT’s review, consisting of <br />preliminary drawings and specifications. DLZ will furnish 1 (one) electronic review copy of <br />the 60% Demolition Documents to the CLIENT. Submittal will include the following <br />deliverables: <br />1) Preliminary Plans <br />2) Preliminary Specifications <br />3) Opinion of Probable Construction Costs <br /> <br />b. DLZ’s services under the Preliminary Demolition Documents will be considered complete <br />on the date when the Preliminary Demolition Document Plans, Preliminary Specifications, <br />and Opinion of Probable Construction Costs have been delivered to the CLIENT. <br /> <br />2. Final Demolition Documents. <br /> <br />a. After acceptance by CLIENT of the Preliminary Demolition Document Plans, Preliminary <br />Specifications, and Opinion of Probable Construction Costs as determined in the <br />Preliminary Demolition Document Phase, and any other deliverables subject to any <br />CLIENT-directed modifications or changes in the scope, extent, character, or design <br />requirements of or for the Project, and upon written authorization from CLIENT, DLZ will: <br />1) Prepare Final Drawings. <br />2) Prepare Final Specifications. <br />3) Prepare Final Opinion of Probable Construction Costs. <br /> <br />b. DLZ will prepare and furnish bidding documents for review by CLIENT, its legal counsel, <br />and other advisors. CLIENT shall submit to Engineer any comments. <br /> <br />c. DLZ will revise the bidding documents in accordance with comments and instructions from <br />the CLIENT, as appropriate and submit 1 (one) electronic final copy of the bidding <br />documents, a revised Opinion of Probable Construction Costs, and any other deliverables <br />to CLIENT after receipt of CLIENT’s comments and instructions. <br /> <br />d. DLZ’s services under the Final Demolition Documents will be considered complete on the <br />date when the Final Demolition Document Plans, Final Specifications, and Final Opinion of <br />Probable Construction Costs have been delivered to the CLIENT. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.