Laserfiche WebLink
Page 3 <br />(Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />3.3.3.3 Develop alignment and layout for proposed storm sewer within the new <br />corridor based primarily on sizing provided in McCormick report. It is <br />anticipated that adjustments to the existing storm sewer calculations will <br />be required based on the preliminary street layout developed as part of the <br />work detailed in Section 6 of this scope of services and in order to account <br />for necessary vertical and horizontal separations and conflict avoidance <br />with other utility relocations analyzed in this project. <br />3.4 Submit preliminary drawings for the proposed facilities. The following preliminary drawings <br />are anticipated to be a part of the design submittal: <br />3.4.1 Overall site layout for proposed utility relocations and/or replacements. <br />3.4.2 Plan view layouts for all improvements included in the project. <br />3.4.3 Preliminary profiles. <br />3.4.4 Preliminary removal and demolition plans. <br />3.5 Create one (1) memo that summarizes findings for stormwater, sanitary sewers, and water <br />mains. <br />3.6 Develop a table of contents for required utility related technical specifications. <br />3.7 Prepare a preliminary opinion of probable construction cost. <br />3.8 Submit one electronic copy set of all documents to the CLIENT for review and comment. <br />3.9 Attend preliminary field check meeting upon submitting preliminary plans. <br /> <br />4.0 WATER RESOURCE UTILITIES – FINAL DESIGN – PHASE 1 <br />4.1 Address CLIENT review comments from preliminary documents submittal. <br />4.2 Complete final design calculations for storm sewer including inlet spacing and storm sewer <br />hydraulic model of the proposed pipe network, assuming a maximum of twelve (12) inlets. <br />4.3 Submit final drawings for the proposed facilities. The following final drawings are <br />anticipated to be a part of the design submittal: <br />4.3.1 Overall site layout for Phase 1 proposed utility relocations and/or replacements <br />4.3.2 Plan view layouts for all improvements included in the project <br />4.3.3 Final profiles <br />4.3.4 Final removal and demolition plans <br />4.3.5 Erosion control plans <br />4.3.6 Structure data table <br />4.3.7 Detail drawings <br />4.4 Prepare utility related technical specifications. Where appropriate City of South Bend <br />standard specifications will be used. <br />4.5 Prepare utility construction permit applications for water main and sanitary sewer. Respond <br />to one round of comments from City of South Bend reviewer. Finalize applications and <br />submit to the Indiana Department of Environmental Management, for Phase 1 improvements <br />only. <br />4.6 Prepare a Construction Stormwater General Permit application packet for submittal to the <br />Regional Soil and Water Conservation District and to Indiana Department of Environmental <br />Management, for Phase 1 improvements only. <br />4.7 Prepare a final opinion of probable cost.