My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1318 East Wayne Street North_AA 2025-0212
sbend
>
Public
>
Historic Preservation
>
2025
>
February
>
Administrative Approvals
>
1318 East Wayne Street North_AA 2025-0212
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2025 12:34:41 PM
Creation date
2/17/2025 12:33:39 PM
Metadata
Fields
Template:
South Bend HPC
HPC Street Address
1318 East Wayne Street North
HPC Document Type
Certification
HPC Local Historic District
viii. East Wayne Street
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
matching the samples or the already existing improvements at the Real Estate. Customer agrees to pay all costs <br />incurred in connection with additional work done at the Real Estate beyond the scope of the Work. <br />10. Customer, at Customer’s sole expense, shall pay for all of Company’s use of electric and water utilities at the Real <br />Estate. <br />11. Unless otherwise expressly provided by this Contract, Customer shall allow Company’s owners, representatives, <br />employees, independent contractors, to use Customer’s restroom on the Real Estate during the duration of the <br />Work. <br />12. Company estimates on concrete removal is based on the assumption that the existing concrete is free of <br />reinforcement and not greater than four inches (4”) thick. In the even concrete at the Real Estate is reinforced or <br />thicker than 4”, Customer shall pay additional amounts charged by Company in connection with the reinforced <br />or thick concrete. <br />13. Customer acknowledges cracking, scaling and discoloration and similar imperfections in concrete my occur <br />despite Company’s skill of workmanship and quality of materials and agrees not to make any claim against <br />Company based on of any such imperfections. <br />14. In the event the Plans and Specifications indicate Company will use Customer’s new or existing equipment or <br />materials, Customer shall be solely liable for all such materials and equipment. In the event Customer performs <br />any work on the Real Estate at the same time or related to the Work performed by the Company, Customer shall <br />be solely liable for all work performed by Customer and shall have no claim against Company related to such <br />work. <br />15. In the event Customer provides materials for the Work, Customer, at Customer’s sole expense, shall provide the <br />specifications for all such material to Company prior to the beginning of the Work and shall provide all such <br />materials to Company at the Real Estate prior to the beginning of the phase of the Work in which said materials <br />will be used. In the event Customer requests Company use any material in the Work from any material provider <br />other than the Company’s customary suppliers, Customer agrees to pay a ten percent (10%) markup on the <br />vendor’s price as a contractor’s fee to the Company. <br />16. Invoices and receipts for materials are not available to the Customer for review. <br />17. Company shall remove all trash and debris created by Company related to the Work at the Real Estate when, in <br />its sole discretion, a full load of trash has accumulated or when Work has been completed. Company shall not be <br />liable for Customer's trash removal. <br />18. Any changes to the Contract or these specifications due to any governmental codes and/or regulations may <br />result in additional cost to Customer. <br />19. Any price allowances or price ranges are estimated prices and the actual prices may vary up or down depending <br />on the amount of work performed. <br />20. All material price quotes are good for __ days. Any increase in material cost after that date will be added to the <br />total cost of the Work. <br />21. In the event Customer and Company agree to a Change Order of the Work, all Change Orders shall be subject to <br />a ten percent (10%) charge in addition to the contractor fee and cost of the work and/or materials included in <br />the Change Order. Such Change Orders include, but are not limited to, changes after the Work has been <br />completed and additions or changes during mechanicals walk-through. <br />22. Customer shall make all selections of materials within the timeline agreed to by Company and Customer. <br />Customer shall be solely liable for all delays in scheduling and completion of the Work, as well as any additional <br />costs related thereto, caused by delays in Customer selection of materials after the agreed time perio
The URL can be used to link to this page
Your browser does not support the video tag.