My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1318 East Wayne Street North_AA 2025-0212
sbend
>
Public
>
Historic Preservation
>
2025
>
February
>
Administrative Approvals
>
1318 East Wayne Street North_AA 2025-0212
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2025 12:34:41 PM
Creation date
2/17/2025 12:33:39 PM
Metadata
Fields
Template:
South Bend HPC
HPC Street Address
1318 East Wayne Street North
HPC Document Type
Certification
HPC Local Historic District
viii. East Wayne Street
Highlight
ID:
1
Creator:
Created:
2/17/2025 12:33 PM
Modified:
2/17/2025 12:32 PM
ID:
2
Creator:
Created:
2/17/2025 12:33 PM
Modified:
2/17/2025 12:32 PM
ID:
3
Creator:
Created:
2/17/2025 12:33 PM
Modified:
2/17/2025 12:32 PM
ID:
4
Creator:
Created:
2/17/2025 12:33 PM
Modified:
2/17/2025 12:32 PM
ID:
5
Creator:
Created:
2/17/2025 12:33 PM
Modified:
2/17/2025 12:32 PM
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Approved by Steven & Bridget Group on Dec 9, 2024 Approved <br />51225 Bittersweet Rd. • Granger, IN 46530 • Phone: 574-532-6425 <br />Steven & Bridget Group <br />Phone: <br />Exterior Work <br />We hereby submit the following "Plans & Specifications" for: <br />Exterior Work @ <br />1318 Wayne Street North <br />South Bend, IN 46617 <br />We propose to provide both the labor and the materials to complete the following work as outlined in these "Plans & Specifications" <br />unless otherwise noted. <br />Print Date: 1-16-2025 <br />Items Description Price <br />Deck Work * Remove existing cedar pergola. <br />* Remove decking materials and framed deck structure. <br />* Dig and pour new structural deck footings. <br />* Building new structure per existing design. <br />* Install new 5/4 x 6" Treated Decking material and Treated Riser Board material. <br />NOTE: A $1,500 allowance has been included to complete the electrical work that <br />exists on the pergola and a receptacle added somewhere on/around the new deck. <br />This allowance can cost can fluctuate up or down depending on the work requested. <br />$20,973.87 <br />Exterior Siding painting Cedar Shake Siding. <br />* Prep the siding by replacing a few shingles that have multiple holes in them or are <br />broken. <br />* Re-nail every shingle to stop the current movement that is causing the paint to fail. <br />* Remove Shutters <br />* Scrape the house as required to remove failing paint. <br />* Caulked and seal gaps. <br />* Apply a "full" stain that looks like paint but "bites" into the wood for good adhesion. <br />** Limestone block to receive same treatment <br />$22,310.00 <br />HVAC * Install an American Standard - Mini Split "Hyper Heat" - Multi head system $17,039.55 <br />New Wood Shutter * Install new solid "cedar" wood shutters. <br />* Complete all painting work and installation <br />$13,581.11 <br />Front Gutter * Remove damaged gutter on the front on the home. <br />* Install new gutter to front of the home. <br />$1,150.00 <br />General Contractor Fee Dailey Project management and oversight, scheduling all materials and trade partners <br />to complete work as will be noted in production schedule. <br />$13,841.02
The URL can be used to link to this page
Your browser does not support the video tag.