Laserfiche WebLink
227 West Jefferson Blvd., Suite 1400S | Ph: 574-235-9371 | Fx: 574-235-9021 | hpcsbsjc@southbendin.gov <br />Description of Proposed Work Please provide a brief detailed summary of the scope of work to be performed. <br /> <br /> Date <br />By signing this application, I agree to abide by all local regulations related to project and to obtain all applicable Building Permits. <br />Cedar Shake Siding. <br />* Prep the siding by replacing a few shingles that have multiple holes in them or are broken. <br />* Re-nail every shingle to stop the current movement that is causing the paint to fail. <br />* Remove Shutters <br />* Scrape the house as required to remove failing paint. <br />* Caulked and seal gaps. <br />* Apply a "full" stain that looks like paint but "bites" into the wood for good adhesion. <br />** Limestone block to receive same treatment <br />Deck Work. <br />* Remove existing cedar pergola. <br />* Remove decking materials and framed deck structure. <br />* Dig and pour new structural deck footings. <br />* Building new structure per existing design. <br />* Install new 5/4 x 6" Treated Decking material and Treated Riser Board material. <br />https://www.timbertech.com/product/pro-legacy-collection/ <br />Wood Shutters <br /> Install new solid "cedar" wood shutters. <br />Front Gutter <br />* Remove damaged gutter on the front on the home. <br />* Install new gutter to front of the home. <br />2/12/2024