<br />BID
<br />6' 0
<br />CITY OFF SOUTH BEND
<br />BE
<br />Project Name:
<br />Mishawaka Avenue Streetscape
<br />erN "-
<br />Project Number:
<br />121-072
<br />For Bids Due:
<br />February 11, 2025, 9:00 a.m., Local Time
<br />Contractor Name:
<br />Rieth-Riley Construction Co., Inc.
<br />ITEOM
<br />DESCRIPTION
<br />QUANTITY
<br />UNIT
<br />UNIT
<br />COST
<br />ITEM COST
<br />60
<br />Joint Adhesive, Intermediate
<br />913
<br />LFT
<br />$2.20
<br />$2,008.60
<br />61
<br />Liquid Asphalt Sealant
<br />1957
<br />LFT
<br />$0.46
<br />$900.22
<br />62
<br />PCCP, 10 in.
<br />938
<br />SYS
<br />$113.05
<br />$106,040.90
<br />63
<br />PCCP, 10 in. Full Depth Colorized Concrete
<br />145
<br />SYS
<br />$170.86
<br />$24,774.70
<br />64
<br />PCCP for Approaches, 6 in.
<br />23
<br />SYS
<br />$107.26
<br />$2,466.98
<br />65
<br />PCCP for Approaches, 9 in.
<br />547
<br />SYS
<br />$110.77
<br />$60,591.19
<br />66
<br />Standard Curb, Concrete
<br />2243
<br />LFT
<br />$35.09
<br />$78,706.87
<br />67
<br />Combination Curb and Gutter, Type B
<br />2045
<br />LFT
<br />$37.58
<br />$76,851.10
<br />68
<br />Curb Ramp, Concrete
<br />233
<br />SYS
<br />$254.28
<br />$59,247.24
<br />69
<br />Sidewalk, Concrete, 4 in.
<br />2182
<br />SYS
<br />$57.46
<br />$125 377.72
<br />70
<br />Sidewalk Pavers
<br />450
<br />SYS
<br />$398.87
<br />$179,491.50
<br />71
<br />Decorative Paver Band
<br />457
<br />LFT
<br />$101.58
<br />$46,422.06
<br />72
<br />Traffic Signal Head, 3-Section, 12 in. Red, 12 in.
<br />Amber, 12 in. Green
<br />8
<br />EA
<br />$1,095.89
<br />$8,767.12
<br />73
<br />Bike Signal Head, 3-Section, 12 in. Red Bike
<br />Symbol, 12 in. Amber Bike Symbol, 12 in. Green
<br />Bike Symbol
<br />2
<br />EA
<br />$1,156.37
<br />$2,312.74
<br />74
<br />Pedestrian Signal Head, Countdown, 18 in.
<br />8
<br />EA
<br />$811.50
<br />$6 492.00
<br />75
<br />Handhole, Signal, Type 1
<br />5
<br />EA
<br />$1,833.72
<br />$9,168.60
<br />76
<br />Conduit, HDPE, 2 in. Schedule 80
<br />344
<br />LFT
<br />$11.99
<br />$4,124.56
<br />77
<br />Painting Traffic Signal Poles and Mast Arms
<br />Black
<br />1
<br />LS
<br />$2,908.20
<br />$2,908.20
<br />78
<br />Relocate Traffic Signal Pole and Mast Ann
<br />3
<br />EA
<br />$2,115.04
<br />$6,345.12
<br />79
<br />Signal Cantilever Structure, Single Arm 25 fl.
<br />1
<br />EA
<br />$20,019.49
<br />$20,019.49
<br />80
<br />Traffic Signal Cantilever Structure, Drilled Shaft
<br />Foundation, T e A
<br />4
<br />EA
<br />$458616
<br />,.
<br />$18,344.64
<br />81
<br />Traffic Signal CabinetTS2
<br />I
<br />EA
<br />$24,132.38
<br />$24,132.38
<br />82
<br />Remove Handhole
<br />1
<br />EA
<br />$461.65
<br />$461.65
<br />83
<br />Signal Pole, Pedestal, 12 ft.
<br />6
<br />EA
<br />$1,191.39
<br />$7,148.34
<br />84
<br />Signal Pole Foundation, 24 in. x 24 in, x 36 in.
<br />6
<br />EA
<br />$988.34
<br />$5,930.04
<br />85
<br />Pedestrian Push Button, APS
<br />4
<br />EA
<br />$2,585.01
<br />$10,340.04
<br />86
<br />Signal Cable, Control, Copper, 3c/14 Gauge
<br />760
<br />LFT
<br />$2.26
<br />1,717.60
<br />87
<br />Signal Cable, Control, Copper, 5c/14 Gauge
<br />1831
<br />LFT
<br />$2,14
<br />$3,918.34