Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: Mishawaka Avenue Streetscape <br />Project Number: 121-072 <br />For Bids Due: February 11, 2025, 9:00 a.m., Local Time <br />Contractor Name: Rieth-Riley Construction Co., Inc. <br />ITEM <br />NO.30 <br />DESCRIPTION <br />QUANTITY <br />UNIT <br />COST UNI <br />ITEM COST <br />12 in. Gate Valve and Box <br />4 <br />EA <br />$5,611.14 <br />$22 444.56 <br />31 <br />6 in. Tapping Sleeve and Valve <br />1 <br />EA <br />$6 809.48 <br />$6,809.48 <br />32 <br />12 in. Tapping Sleeve and Valve <br />2 <br />EA <br />$11,695.20 <br />$23,390.40 <br />33 <br />12 in. x 8 in. Tee <br />2 <br />EA <br />$3,207.64 <br />$6,415.28 <br />34 <br />12 in. Tee <br />I <br />EA <br />$3,562.94 <br />$3,562.94 <br />35 <br />8 in. x 6 in. Reducer <br />2 <br />EA <br />$1,378.61 <br />$2 757.22 <br />36 <br />12 in. x 6 in. Reducer <br />I <br />EA <br />$2,456.12 <br />$2,456.12 <br />37 <br />6 in., Any Degree Bend, Ductile Iron Fitting <br />I <br />EA <br />$1,110.83 <br />$1,110.83 <br />38 <br />8 in., Any Degree Bend, Ductile Iron Fitting <br />4 <br />EA <br />$1,869.58 <br />$7,478.32 <br />39 <br />12 in., Any Degree Bend, Ductile Iron Fitting <br />16 <br />EA <br />$2,497.46 <br />$39,959.36 <br />40 <br />Water Service Replacement— Short Side <br />8 <br />EA <br />$6,775.89 <br />$54,207.12 <br />41 <br />Water Service Replacement — LongSide <br />14 <br />EA <br />$9,815.04 <br />$137,410.56 <br />42 <br />Fire Hydrant Assembly, Abandon & Remove <br />2 <br />EA <br />$508.64 <br />$1,017.28 <br />43 <br />Fire Hydrant Assembly (All Types) <br />2 <br />EA <br />$8,959.67 <br />$17,919.34 <br />44 <br />Temporary Test Riser <br />1 <br />EA <br />$4,015.36 <br />$4,015.36 <br />45 <br />Water Main, Remove <br />775 <br />LFT <br />$36.91 <br />$28,605.25 <br />46 <br />Cut and Plug Pipe <br />3 <br />EA <br />$990.39 <br />$2,971.17 <br />47 <br />Subgrade Treatment Type 11 <br />504 <br />SYS <br />$39.26 <br />$19,787.04 <br />48 <br />Structure Backfill, Type 1 <br />1812 <br />CYS <br />$37.54 <br />$68,022.48 <br />49 <br />Compacted Aggregate, No. 53 <br />1703 <br />TON <br />$59.17 <br />$100,766.51 <br />50 <br />Milling, Asphalt,1.5 in. <br />4305 <br />SYS <br />$4.96 <br />$21,352.80 <br />51 <br />Milling, Approach <br />557 <br />SYS <br />$12.31 <br />$6,856.67 <br />52 <br />HMA Surface PG58H-28, 9.5 turn, Type C <br />452 <br />TON <br />$117.02 <br />$52,893.04 <br />53 <br />HMA Intermediate, 12.5 mm, Type B <br />246 <br />TON <br />$118.59 <br />$29,173.14 <br />54 <br />HMA Base, 25.0 mm, Type B <br />590 <br />TON <br />$94.81 <br />$55,937.90 <br />55 <br />HMA Patching, Full Depth, Type B <br />708 <br />TON <br />$248.40 <br />$175,867.20 <br />56 <br />HMA Wedge and Level, Type B <br />149 <br />TON <br />$109.90 <br />$16,375.10 <br />57 <br />HMA for Approaches, Type B <br />127 <br />TON <br />$188.58 <br />$23,949.66 <br />58 <br />Asphalt for Tack Coat <br />3 <br />TON <br />$712.80 <br />$2,138.40 <br />59 <br />Joint Adhesive, Surface <br />1957 <br />LFT <br />$0.98 <br />$1,917.86 <br />