Project Name:
<br />Project Number:
<br />BIDIPROPOSAL
<br />CITY OF SOUTH BEND
<br />Mishawaka Avenue Streetscape
<br />121-072
<br />For Bids Due: February 11, 2025, 9:00 a.m., Local Time
<br />Contractor Name: Rieth-Riley Construction Co., Inc.
<br />ITEM
<br />NO.88
<br />DESCRIPTION
<br />QUANTITY
<br />UNIT
<br />CUpIT
<br />ITEM COST
<br />Gridsmart Hemispherical Camem Detection
<br />System
<br />1
<br />LS
<br />$28,509.97
<br />$28 509.97
<br />89
<br />CATSe Ethernet Cable for Video Detection
<br />175
<br />LFT
<br />$5.83
<br />$1,020.25
<br />90
<br />Light Pole, 40 ft E.M.H., 20 ft Mast Ann, Anchor
<br />Base
<br />1
<br />EA
<br />$6,748.94
<br />$6,748.94
<br />91
<br />Lighting Foundation, Concrete, with Grounding,
<br />24 in. X 24 in. X 96 in.
<br />1
<br />EA
<br />$1,496.18
<br />$1,496.18
<br />92
<br />Light Standard, Type A
<br />7
<br />EA
<br />$7,693.40
<br />$53,853.80
<br />93
<br />Light Standard, Type B
<br />4
<br />EA
<br />$12,012.14
<br />$48,048.56
<br />94
<br />Light Standard Foundation
<br />11
<br />EA
<br />$1,024.07
<br />$11264.77
<br />95
<br />Electrical Wiring, #4 XHHW
<br />2700
<br />LFT
<br />$2.14
<br />$5,778.00
<br />96
<br />Electrical Wiring,#6 XHHW
<br />2700
<br />LFT
<br />$1.87
<br />$5,049.00
<br />97
<br />HDPE Schedule 80 Conduit, 2 in.
<br />1800
<br />LFT
<br />$10.14
<br />$18,252.00
<br />98
<br />Electrical Service Point, Tesco, Dual Meter
<br />1
<br />EA
<br />$12,326.46
<br />$12,326.46
<br />99
<br />Bike Hitch
<br />t0
<br />EA
<br />$3,439.68
<br />$34,396.80
<br />100
<br />Tree Grates
<br />14
<br />EA
<br />$2,911.20
<br />$40,756.80
<br />101
<br />Bench
<br />1
<br />EA
<br />$5,249.70
<br />$5,249.70
<br />102
<br />Overstory Tree, 2 %: in. Caliper
<br />54
<br />EA
<br />$779.00
<br />$42,066.00
<br />103
<br />Line, Thermoplastic, Solid, Yellow, 4 in.
<br />2244
<br />LFT
<br />$1.05
<br />$2,356.20
<br />104
<br />Line, Thermoplastic, Broken, Yellow, 4 in.
<br />20
<br />LFT
<br />$1.05
<br />$21.00
<br />105
<br />Line, Thermoplastic, Solid, White, 4 in.
<br />2162
<br />LFT
<br />$1.05
<br />$2,270.10
<br />106
<br />Line, Thermoplastic, Broken, White, 4 in.
<br />190
<br />LFT
<br />$1.05
<br />$199.50
<br />107
<br />Transverse Marking, Thermoplastic, Stop Line,
<br />White, 24 in.
<br />138
<br />LFT
<br />$8.95
<br />$1,235.10
<br />108
<br />Transverse Marking, Thermoplastic, Crosswalk
<br />Line, White, 6 in.
<br />633
<br />LFT
<br />$1.25
<br />$791.25
<br />109
<br />Transverse Marking, Thermoplastic, Crosswalk
<br />Line, White, 24 in.
<br />360
<br />LFT
<br />$8.95
<br />$3,222.00
<br />110
<br />Pavement Message Marking,Thermoplastic,Lane
<br />Indication Arrow
<br />8
<br />EA
<br />$125.00
<br />$1,000.00
<br />III
<br />Line, Thermoplastic, Dotted, Yellow, 4 in., 3 ft.
<br />line, 9 ft. Gap
<br />138
<br />LFT
<br />$1.05
<br />$144.90
<br />112
<br />Line, Thermoplastic, Dotted, White, 4 in., 3 ft.
<br />line, 9 ft. Gap$31.50
<br />30
<br />LFT
<br />$1.05
<br />113
<br />Transverse Marking, Thermoplastic, Crosshatch
<br />Line, Yellow, 12 in.
<br />10
<br />LFT
<br />$4.95
<br />$49.50
<br />114
<br />Transverse Marking, Bike Symbol
<br />8
<br />EA
<br />$165.00
<br />$1,320.00
<br />
|