Laserfiche WebLink
Breckinridge County Schools � �■ s� � CMTA <br />Guaranteed Energy Savings Contract <br />Annual Reconciliation Report (2023-2024) <br />Year 4 Summary <br />During Year 4, the project experienced energy savings in the form of electrical consumption, electrical <br />demand, fuel consumption, and water consumption. A building -by -building breakdown of these energy <br />savings can be seen in Table 4-6 below. <br />PF <br />Breckinridge County High School <br />Breckinridge County Middle School <br />Custer Elementary School <br />Ben Johnson Elementary School <br />Hardinsburg Elementary School <br />Irvington Elementary School <br />District Office <br />Annex Building <br />1,434,960 <br />4,176 48,422 <br />138 <br />616,346 <br />1,807 -6,997 <br />242 <br />127,087 <br />518 <br />75 <br />151,390 <br />420 730 <br />36 <br />94,425 <br />— — <br />— <br />66,401 <br />— — <br />— <br />7,880 <br />— — <br />— <br />45,453 <br />73 — <br />— <br />Table 4-6: Year 4 Energy and Resource Savings by Building <br />Year 4 of the project experienced utility savings totaling $337,256. Table 4-7 breaks down these dollar <br />savings by electricity, fuel, and water. <br />2,543,942 $212,534 <br />6,994 $84,090 <br />42,217 I $29,111 <br />491 $11,521 <br />Table 4-7: Year 4 Utility Dollar Savings <br />Page Content is Subject to Confidentiality Restrictions <br />4-7 <br />9519 Civic Way, Suite 100 1 Prospect, KY 40059 1502.409.4062 1 cmta.com <br />Performance Contracting I MEP Engineering I Zero Energy Engineering I Technology I Commissioning <br />