My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment - Finalizes Full GMP for Four Winds Field Renovation and Expansion - Larson-Danielson
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
Amendment - Finalizes Full GMP for Four Winds Field Renovation and Expansion - Larson-Danielson
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 3:54:31 PM
Creation date
1/14/2025 12:38:40 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/14/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
IMILARSOIN City of South Bend ON FOUR WINDS FIELD EXPANSION & RENOVATION <br />DANIELS <br />Construction Company, Inc. GMP EXHIBIT 5 <br />Assumptions and Clarifications <br />The following assumptions and clarifications apply to the Scope of Work included in the Guaranteed <br />Maximum Price. <br />The Scope of Work included in the Guaranteed Maximum Price is that described in the <br />specifications (GMP Exhibit 2), drawings (GMP Exhibit 3), and allowances (GMP Exhibit 4), subject <br />to the assumptions and clarifications noted below. <br />2. No testing for, or demolition and removal of, Hazardous Materials is included, regardless of <br />notes regarding or allusions to the presence of Hazardous Materials in the Contract Documents. <br />A Hazardous Material is any substance or material identified now or in the future as hazardous <br />under any federal, state or local law or regulation, or any other substance or material including <br />mold, fungi, or bacteria which may be considered hazardous or otherwise subject to statutory or <br />regulatory requirement governing handling, disposal or clean-up. The Construction Manager <br />shall not be obligated to commence or continue work until any Hazardous Material discovered at <br />the project Worksite has been removed, rendered or determined to be harmless by the Owner <br />as certified by an independent testing laboratory and approved by the appropriate government <br />agency. <br />3. Costs or fees assessed by utility companies related to the project or required to complete the <br />work are not included in the Guaranteed Maximum Price. These costs or fees include, but are not <br />limited to, tap fees, impact fees, line installation charges, meter charges, inspection fees, <br />connection charges, etc. <br />4. Neither removal nor re -installation of existing furnishings and equipment are included in the <br />Guaranteed Maximum Price. These existing furnishings and equipment include, but are not <br />limited to, signage and artwork, banners, food and souvenir vendor carts, inflatable play <br />structures, storage shelves and cribs, tables, desks, chairs, projectors, televisions, computers, <br />phones, and other technology devices. <br />5. Commissioning of systems is not included in the Guaranteed Maximum Price. Start-up <br />requirements noted in the specifications are included. <br />6. The only signage included in the Guaranteed Maximum Price is that included in the allowance <br />for signage noted in GMP Exhibit 4. This allowance is for the signage work noted on the plans. <br />New signage, or reinstallation of existing signage that was connected to demolished structure, <br />on the concourse level in Areas A, B, C, and D is not noted on the plans. <br />Graphic printed films on portions of the work are not included in the Guaranteed Maximum <br />Price. These films included, but are not limited to, those noted at the elevators or glass surfaces. <br />These films are assumed to be provided by the City of South Bend or the South Bend Cubs. <br />8. New finishes are included only as shown on the finish schedule on sheets 1-A600 and 3-A600. <br />Rooms where other work occurs, but which are not noted to receive new finishes on sheet <br />1-A600 or 3-A600, will not receive new finishes. <br />GMP Exhibit 5 Page 36/39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.