My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - CMc for Madison Lifestyle New Parking Garage Proj No 123-074 - CRG Residential
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Quotations/Proposals
>
Opening of Proposals - CMc for Madison Lifestyle New Parking Garage Proj No 123-074 - CRG Residential
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 2:03:44 PM
Creation date
12/17/2024 1:07:50 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/17/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MBE & WBE Experience <br />Considering this project has goals for MBE (minority), WBE (women), VBE (veteran), <br />DOBE (disability -owned), or Work Force Diversity Goals, it should be understood that <br />CRG has experience with both local and state agencies that assist with outreach and <br />engagement of this community. CRG has several projects in which it has met or <br />exceeded these goals, including Post House in Evansville IN, Saint Lucas Lofts and <br />Passage Apartments in Indianapolis. On the two Indianapolis projects CRG worked <br />closely with Joe Lee the Contract Compliance Officer with the City of Indianapolis - <br />Office of Minority and Women Business Development to ensure that all MBE and <br />WBE goals were acheived. <br />Price Proposal and Project Cost <br />CRG will provide pre -construction services for the City/Owner with respect to the <br />project for a fee of 0.5% of the cost of the work. "Pre -construction services" shall <br />include the following: <br />• Prepare preliminary estimates of the work as information becomes available (but not <br />more than once based on schematic drawings, not more than once based on design <br />drawings, and a final estimate upon completion of 100% construction drawings). At <br />each stage, the master budget will be revised and updated accordingly. <br />• Provide value engineering input by reviewing conceptual and working drawings <br />during their preparation focusing on construction means and methods. <br />• Provide cost analyses of design options and make recommendations for alternatives <br />to be included in bid packages. <br />• Evaluate market conditions and schedule bid calls to obtain the most competitive <br />prices that are commensurate with overall project scheduling and the City/Owner's <br />project goals. <br />• Prepare a preliminary schedule following initial review of the project documents <br />available as of the effective date of a formal agreement between CRG and the <br />City/Owner, which schedule will contain activities integrating obligations of the <br />entire construction team to include bidding and a detailed monthly activity schedule <br />for construction duration. <br />• Provide value engineering analysis based on schematic drawings and 100% design <br />drawings stages, with such value engineering analysis to include presenting the <br />City/Owner with options and creating alternates for final bid documents. <br />• Assist the City/Owner with analysis of materials being used in the local market and <br />determining cost impact. <br />'000■ <br />CM <br />RESIDENTIAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.