Laserfiche WebLink
<br />39 <br /> <br /> <br /> <br /> <br /> <br /> <br />COST ESTIMATE REPORT <br />DATE: 10/23/2023 <br />Estimate Name:City of South Bend - AC Replacement Dewatering Building <br />Estimate Summary:Catalog: <br /> Material Labor Equipment Total*Format: <br />Total with Soft Costs 4,040$ 2,079$ -$ $ 6,119 Release: <br />Labor Type: <br />Data Release : Year 2023 Unit Cost Lines City Cost Inde <br />Description Quantity LineNumber Crew Daily <br />Output Labor Hours Unit Material Labor Equipment Total Ext. Mat. Ext. Labor Ext. Equip. Ext. Total <br />Split ductless system, cooling only, <br />single zone, wall mount, 2 ton cooling 1 238126100150 Q5 1 11 Ea. 2,525$ 623$ -$ 3,148$ 2,525$ 623$ -$ 3,148$ <br />Split ductless system, accessories <br />for all split ductless systems, for tube <br />/ wiring kit, 15' kit <br /> - 238126107030 Q5 32 1 Ea. 190$ 27$ -$ 217$ -$ -$ -$ -$ <br />Demo window AC and repair window 1 2 - - 200$ 500$ -$ 700$ 200$ 500$ -$ 700$ <br />Engineering 8% <br />Existing Building Conditions 20% <br />Construction Manager 6% <br />Total with Soft Costs <br />Description Mat. O&P Labor O&P Equip. O&P Total O&P Ext. Mat. <br />O&P <br /> Ext. Labor <br />O&P <br /> Ext. Equip. <br />O&P <br /> Ext. Total <br />O&P <br />Split ductless system, cooling only, <br />single zone, wall mount, 2 ton cooling 2,775$ 952$ -$ 3,727$ 2,775$ 952$ -$ 3,727$ <br />Split ductless system, accessories <br />for all split ductless systems, for tube <br />/ wiring kit, 15' kit <br />209$ 42$ -$ 251$ -$ -$ -$ -$ <br />Demo window AC and repair window 240$ 600$ -$ 840$ 240$ 600$ -$ 840$ <br />3,015$ 1,552$ -$ 4,567$ <br />Engineering 241$ 124$ -$ 365$ <br />Existing Building (RS Means was for <br />new construction)603$ 310$ -$ 913$ <br />Construction Manager 181$ 93$ -$ 274$ <br />Total with Soft Costs 4,040$ 2,079$ -$ 6,119$ <br /> INDIANA / SOUTH BEND (465-466) <br />COST DATA <br />.....Commercial Renovation <br />MasterFormat 2018 <br />Year 2024 <br />STD