Laserfiche WebLink
<br />38 <br /> <br /> <br />ECM 5 AC Unit in Dewatering Office <br />COST ESTIMATE REPORT <br />DATE: 10/23/2023 <br />Estimate Name:City of South Bend - ACCU Replacement Headworks Building <br />Estimate Summary:Catalog: <br /> Material Labor Equipment Total*Format: <br />Total with Soft Costs 25,132$ 24,589$ 7,024$ $ 56,745 Release: <br />Labor Type: <br />Data Release : Year 2023 Unit Cost Lines City Cost Ind <br />Description Quantity LineNumber Crew Daily <br />Output Labor Hours Unit Material Labor Equipment Total Ext. Mat. Ext. Labor Ext. Equip. Ext. Total <br />Condensing unit, up thru 10 ton, <br />selective demolition 1 230505100660 Q5 1 13 Ea. -$ 698$ -$ 698$ -$ 698$ -$ 698$ <br />HVAC, selective demolition, minimum <br />labor/equipment charge 1 230505109000 Q6 3 8 Job -$ 452$ -$ 452$ -$ 452$ -$ 452$ <br />Refrigeration specialties, filter dryer, <br />replaceable core type, soldered, 1- <br />5/8" <br /> 1 232316101070 1 Stpi 12 1 Ea. 227$ 41$ -$ 267$ 227$ 41$ -$ 267$ <br />Refrigeration specialties, sightglass, <br />moisture and liquid indicator, <br />soldered, 1-3/8" <br /> 1 232316105080 1 Stpi 14 1 Ea. 77$ 35$ -$ 112$ 77$ 35$ -$ 112$ <br />Refrigerant line sets, insulated copper <br />supply and return tubes, 1/2" and 1- <br />1/8" tubes, 1/2" insulation, 50' long <br /> 1 232316162150 Q5 14 1 Ea. 1,024$ 62$ -$ 1,086$ 1,024$ 62$ -$ 1,086$ <br />Refrigerant line sets, insulated copper <br />supply and return tubes, add, for 1" <br />thick insulation <br /> 1 232316162150 - - 307$ 9$ -$ 317$ 307$ 9$ -$ 317$ <br />Condensing unit, air cooled, <br />compressor, 7.5 ton, includes <br />standard controls <br /> 1 236213100550 Q5 1 29 Ea. 3,800$ 1,586$ -$ 5,386$ 3,800$ 1,586$ -$ 5,386$ <br />Refrigeration specialties, refrigerant, R- <br />134A, 30 lb. disposable cylinder 50 232323204428 - - Lb. 14$ -$ -$ 14$ 692$ -$ -$ 692$ <br />Remove old refrigerant coil and <br />replace with new. Incudes opening up <br />housing. <br /> 1 1 - - Ea. 10,000$ 5,000$ -$ 15,000$ 10,000$ 5,000$ -$ 15,000$ <br />Crane crew, daily use for small jobs, <br />25-ton truck-mounted hydraulic crane, <br />portal to portal <br /> 2 015419500200 A3I 1 8 Day -$ 455$ 2,369$ 2,824$ -$ 910$ 4,738$ 5,648$ <br />Engineering 8% <br />Existing Building Conditions 20% <br />Construction Manager 6% <br />Total with Soft Costs <br />Description Mat. O&P Labor O&P Equip. O&P Total O&P Ext. Mat. <br />O&P <br /> Ext. Labor <br />O&P <br /> Ext. Equip. <br />O&P <br /> Ext. Total <br />O&P <br />Condensing unit, up thru 10 ton, <br />selective demolition -$ 1,071$ -$ 1,071$ -$ 1,071$ -$ 1,071$ <br />HVAC, selective demolition, minimum <br />labor/equipment charge -$ 698$ -$ 698$ -$ 698$ -$ 698$ <br />Refrigeration specialties, filter dryer, <br />replaceable core type, soldered, 1- <br />5/8" <br />250$ 62$ -$ 312$ 250$ 62$ -$ 312$ <br />Refrigeration specialties, sightglass, <br />moisture and liquid indicator, <br />soldered, 1-3/8" <br />85$ 54$ -$ 139$ 85$ 54$ -$ 139$ <br />Refrigerant line sets, insulated copper <br />supply and return tubes, 1/2" and 1- <br />1/8" tubes, 1/2" insulation, 50' long <br />1,124$ 96$ -$ 1,220$ 1,124$ 96$ -$ 1,220$ <br />Refrigerant line sets, insulated copper <br />supply and return tubes, add, for 1" <br />thick insulation <br />337$ 14$ -$ 352$ 337$ 14$ -$ 352$ <br />Condensing unit, air cooled, <br />compressor, 7.5 ton, includes <br />standard controls <br />4,200$ 2,438$ -$ 6,638$ 4,200$ 2,438$ -$ 6,638$ <br />Refrigeration specialties, refrigerant, R- <br />134A, 30 lb. disposable cylinder 15$ -$ -$ 15$ 759$ -$ -$ 759$ <br />Remove old refrigerant coil and <br />replace with new. Incudes opening up <br />housing. <br />12,000$ 5,000$ -$ 17,000$ 12,000$ 5,000$ -$ 17,000$ <br />Crane crew, daily use for small jobs, <br />25-ton truck-mounted hydraulic crane, <br />portal to portal <br />-$ 709$ 2,621$ 3,330$ -$ 1,419$ 5,242$ 6,660$ <br />18,755$ 18,350$ 5,242$ 42,347$ <br />Engineering 1,500$ 1,468$ 419$ 3,388$ <br />Existing Building (RS Means was for <br />new construction)3,751$ 3,670$ 1,048$ 8,469$ <br />Construction Manager 1,125$ 1,101$ 314$ 2,541$ <br />Total with Soft Costs 25,132$ 24,589$ 7,024$ 56,745$ <br /> INDIANA / SOUTH BEND (465-466) <br />COST DATA <br />.....Commercial Renovation <br />MasterFormat 2018 <br />Year 2024 <br />STD