My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotations - EVSE Installation Proj No 124-052 - Barnes Concepts
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Quotations/Proposals
>
Opening of Quotations - EVSE Installation Proj No 124-052 - Barnes Concepts
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 3:05:08 PM
Creation date
12/10/2024 2:03:30 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/10/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Positioning the cable clamp <br />1. Pull on the cable of the Cable management system to <br />hold the cable clamp in your hand. <br />2. Remove Torx screws. <br />3. Determine where to position the charging station cable <br />clamp. <br />Recommendation: The cable portion between the clamp <br />and the charging connector must not touch the ground when <br />the Cable management system is completely retracted. The <br />cable should hang about 2.5 in above the ground. <br />4. Apply the self-adhesive rubber band around the cable for <br />protection purposes. Set the clamp over the band and <br />reinsert the screws in it by adjusting the torque of your <br />tool to 7 in -lb. <br />5. Let the cable retract itself. Verify the clearing between <br />the charging station cable and the ground. <br />6. Roll the cable overhang around the charging station <br />cable holder. <br />EO <br />P <br />a <br />0 <br />CoRe+'M 15 <br />Cable management system and pedestal installation guide <br />
The URL can be used to link to this page
Your browser does not support the video tag.