My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotations - EVSE Installation Proj No 124-052 - Barnes Concepts
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Quotations/Proposals
>
Opening of Quotations - EVSE Installation Proj No 124-052 - Barnes Concepts
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 3:05:08 PM
Creation date
12/10/2024 2:03:30 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/10/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Positioning the poster pane <br />Poster panel (including two sides) 2 <br />Attachment plate and screws I <br />Bolts 4 <br />Washers 4 <br />Rondelle de blocage / Split Lock Washer 4 <br />1. The top of the columns has embedded screws with rubber <br />caps and washers attached to them. Remove them and set <br />aside. <br />2. The poster panel is comprised of two parts. Before installing <br />it secure the attachment plate to the base of one of the <br />panels with the screws provided. The plate is placed inside <br />the panel, and the screws are inserted inwards. <br />o <br />� <br />a <br />CoRe+'M 16 <br />Cable management system and pedestal installation guide <br />
The URL can be used to link to this page
Your browser does not support the video tag.