My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotations - EVSE Installation Proj No 124-052 - Barnes Concepts
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Quotations/Proposals
>
Opening of Quotations - EVSE Installation Proj No 124-052 - Barnes Concepts
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 3:05:08 PM
Creation date
12/10/2024 2:03:30 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/10/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Side -to -side charging station <br />supports and cable managements <br />installation <br />8. Insert the other end of the flexible tube in the hole <br />provided for this purpose, and screw the bushing from <br />the exterior of the charging station mount bracket so to <br />maintain the flexible tube in place. <br />Remark: This will allow to hold the column during the <br />installation of the bottom column mount brackets. <br />9. Install both column mount brackets starting with the 1st <br />assembly (1 on illustration) then proceed installing the 2nd <br />(2 on illustration). <br />Remarks: Each column mount bracket has a slot to make <br />its installation easier, which must be place on the front side <br />of the bracket, in other words on the side where the charging <br />station will be installed. Do not screws the bolts too tight <br />when placing the brackets so you can move them easily and <br />position them correctly. Once everything is well positioned, <br />tighten the bolts. <br />10. Secure the back cover in the column mount brackets <br />with the four screws. <br />11. Install the second column on the opposite side of the <br />charging station by following the above steps 1 to 10. <br />12. Install or reinstall the charging stations. Refer to the <br />CoRe+ MC Installation Guide if need be. <br />13. Proceed with the positioning of the cable clamp. Refer to <br />page 15. <br />14. Install the poster panel. Refer to page 16. <br />i <br />0 <br />0 <br />n <br />0 <br />0 <br />50A <br />CoRe+'M I <br />14 <br />Cable management system and pedestal installation guide <br />
The URL can be used to link to this page
Your browser does not support the video tag.