My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotations - EVSE Installation Proj No 124-052 - Barnes Concepts
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Quotations/Proposals
>
Opening of Quotations - EVSE Installation Proj No 124-052 - Barnes Concepts
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 3:05:08 PM
Creation date
12/10/2024 2:03:30 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/10/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BEFORE GETTING STARTED <br />! When unpackaging the Cable management system, make sure to remove the security <br />° screw used to hold the counterweight during transport. <br />i Installing new side -by -side charging stations <br />• First, install the pedestal. Refer to CoRe+ MC Installation Guide for pedestal. <br />• Then, prepare installation material for the side -by -side charging station mount <br />brackets and Cable management systems, and follow the instructions that are <br />indicated below. <br />• Finally, install the charging stations. Refer to CoRe+ MC Installation Guide. <br />• Installing on existing side -by -side charging stations <br />Caution : Before getting started, cut off the current to prevent an electric shock. <br />INSTALLATION ON PRE -INSTALLED CHARGING STATIONS <br />1. Remove both charging stations from the pedestal so that you can install the new side -by -side <br />charging station mount brackets and the two Cable management systems. <br />2. Remove the wiring as you will need to hook the charging stations to new wires. <br />3. Then, prepare installation material for the side -by -side charging station mount brackets and Cable <br />management systems, and follow the instructions that are indicated below. <br />4. Reinstall the charging station on the new brackets. <br />Allow 10" (30 cm) of additional electrical wiring to connect the new charging station <br />to the installation. <br />Side -to -side charging <br />station supports and cable <br />managements installation <br />1. Assemble the flexible tube. <br />2. Remove the plate giving you access to the electric wires at the bottom <br />of the pedestal and allow 30 cm (10 in) of extra wiring so to connect the <br />charging station once the flexible tube has been installed. <br />3. Screw the end of the flexible tube to the charging station mount bracket, on <br />the pedestal side. <br />4. Pass wires through the flexible tube. <br />5. Screw the first charging station mount bracket to the pedestal* using the <br />holes provided for this purpose with the included screws, that is, the holes <br />that were used to secure the charging stations that were installed back-to- <br />back previously. <br />Caution: This pedestal is certified like an electrical enclosure, and any alteration must <br />comply with local regulation. <br />6. Place the column of the Cable management system inside the charging <br />station mount bracket, place tightly in the corner. <br />Recommendation : To position the column, when you stand in front of the <br />charging station, make sure to place the output (cable clamp) of the Cable <br />management system on the exterior side, and a gasket is inserted between the <br />pedestal and the back cover. <br />7. Screw the bottom column of the Cable management system by placing the <br />round spacing shim between the pedestal and the column, and tighten the <br />screws solidly to secure the column. <br />CoRe+'" 13 <br />Cable management system and pedestal installation guide <br />
The URL can be used to link to this page
Your browser does not support the video tag.