Laserfiche WebLink
Dual side -to -side charging <br />station installation <br />Included material <br />Cable management system columns and cable clamp <br />QtY <br />2 <br />Round spacing shims <br />2 <br />Self-adhesive rubber band <br />2 <br />1/4-20 screws (1 ") (for pre -drilled pedestal) <br />6 <br />Self -drilling screws (1 ") (for pedestal with no holes) <br />6 <br />Drilling template (for pedestal with no holes) <br />1 <br />Charging station mount brackets (V-shape mount) and 1/4-20 screws <br />2 <br />Flexible tube <br />2 <br />Column mount brackets,1/4-20 screws and bolts <br />4 <br />Back cover and screws <br />2 <br />Drilling template (bottom pedestal <br />Gasket <br />Rectangular spacing shims <br />1 <br />2 <br />2 <br />IF THE PEDESTAL IS NOT PRE -DRILLED, USE THE FOLLOWING DRILLING TEMPLATES: <br />o <br />o <br />ll <br />0 <br />Top Drilling template Bottom Drilling template <br />M EC-CST-00280 M EC-CST-00278 <br />CoRe+TM I <br />12 <br />Cable management system and pedestal installation guide <br />