Laserfiche WebLink
BEFORE GETTING STARTED <br />! When unpackaging the Cable management system, make sure to remove <br />® the security screw used to hold the counterweight during transport. <br />i Installing on new back-to-back dual charging stations. <br />First, install the pedestal and the two charging stations. Refer to CoRe+ MC <br />Installation Guide for piedestal and CoRe+ MC Installation Guide respectively. <br />Then, install the Cable management system as indicated below. If the pedestal <br />is pre -drilled, use the 1/4-20 screws provided in the package. Otherwise, use the <br />drilling template and self -drilling screws also included with the kit. Refer to the <br />illustration on the former to know where to place the template on the pedestal, <br />and mark the holes to drill. <br />i Installing on existing back-to-back dual charging stations. <br />Drill holes that will be used to secure the Cable management system attachment hardware. Use <br />the drilling template and the self -drilling screws provided with the kit. <br />Cable management <br />system installation <br />1. Install the rectangular spacing shim, place the column <br />and than install the upper mount bracket on top. <br />Screw parts loosely with 1/4-20 or self -drilling screws, <br />depending on the type of pedestal you have, so the <br />Cable management system column is maintained in <br />place and moves freely to install the lower mounting <br />hardware. <br />Recommendation: To position the column, when <br />standing in front of the charging station, make sure to <br />place the output of the Cable management on the exterior <br />side. <br />2. Screw the column of the Cable management system <br />by placing the round spacing shim (circled in red in <br />the image included) between the pedestal and the <br />column, and tighten the screws to solidly secure the <br />column. <br />3. Secure the top bracket. <br />4. Install the empty column on the opposite side of the <br />charging station by following the above steps 1 to 3. <br />5. Proceed with the positioning of the cable clamp. Refer <br />to page 15. <br />6. Install the poster panel. Refer to page 16. <br />Caution : This pedestal is certified like an electrical enclosure, <br />and any alteration must comply with local regulation. <br />0 <br />r9 <br />CoRe+'" 111 <br />Cable management system and pedestal installation guide <br />