Laserfiche WebLink
<br /> <br />Page 5 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />o Prepare 30% Plans Submittal, including: <br /> Title sheet and index. <br /> Typical cross sections. <br /> Preliminary Maintenance of Traffic plan <br />· Includes layout & signage as required for construction. <br /> Plan and Profile sheets. <br /> Preliminary driveway and roadway approaches design <br /> Preliminary curb ramp & sidewalk design <br /> Preliminary storm and sanitary drainage layout & design <br /> Cross Sections <br /> Quantity Calculations <br /> Cost Estimate <br /> Submit Plans and supporting documentation to Owner for Review. <br />o Attend Preliminary Field Check Meeting, including: <br /> Address comments from 30% Review. <br /> Preliminary Traffic Detail Sheets <br /> Update Detail Sheets. <br /> Update Quantity Calculations <br /> Updated Cost Estimate <br /> Prepare and distribute PFC Plans & Notification Letter to key stakeholder and <br />utilities <br /> Prepare PFC Meeting Minutes <br /> Prepare Preliminary Right of Way Plans <br />o Prepare 60% Plans Submittal, including: <br /> Address comments from PFC meeting. <br /> Finalize Title & Index Sheets <br /> Finalize MOT Plan Sheets <br /> Prepare Preliminary Erosion Control Plan Sheets <br /> Prepare Preliminary Lighting Plans <br /> Prepare Preliminary Landscaping Plans <br /> Finalize Storm and Sanitary Drainage Layout & Design <br /> Finalize Detail Sheets <br /> Prepare Preliminary Summary Tables <br /> Prepare pavement design per City of South Bend standards <br /> Update Cross Sections <br /> Update Quantity Calculations & Cost Estimate <br /> Update Design Documentation (If Necessary) <br /> Submit Plans and supporting documentation to Owner for Review <br />o Attend Final Field Check Meeting, including: <br /> Address comments from 60% Review <br /> Finalize General Notes on Index Sheet <br /> Finalize Plan & Profile Sheets <br /> Finalize Detail Sheets <br /> Finalize Summary Tables <br /> Update Quantity Calculations & Cost Estimate <br /> Prepare and distribute FFC Plans & Notification Letter to key stakeholder and <br />utilities <br /> Prepare FFC Meeting Minutes <br />o Prepare 90% Plans Submittal, including: <br /> Address comments from FFC Meeting <br /> Prepare SWPPP according to the IN Construction General Stormwater Permit, <br />get Soil and Water Conservation District technical approval and submit to IDEM <br /> Finalize Plans & Cross Sections <br /> Finalize Color Plan Rendering <br /> Coordinate Permit efforts needed <br /> Finalize Quantity Calculations & Cost Estimate <br /> Submit Plans and specifications to Owner for Review