My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Drewry’s Brewery Phase II - Bottling House Demo Proj No. 119-031D - Renascent Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Bids
>
Opening of Bids - Drewry’s Brewery Phase II - Bottling House Demo Proj No. 119-031D - Renascent Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2024 1:26:45 PM
Creation date
7/23/2024 1:23:42 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/23/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
u <br />BSU Lafollette Complex, Phase 2, Muncie, IN <br />Owner Ball State University <br />General Contractor Renascent, Inc. <br />Size 285,000 square feet —11 stories at tallest point on Shively. <br />Delivery Method <br />Contract Value <br />Start Date <br />Completion Date <br />Total Hours Worked <br />Recordable Incidents <br />Recycle Rate <br />Industry Segment <br />Project Scope Summary <br />Otherwise most of structures were 8 stories. <br />Prime Contractor <br />$3,771,900 <br />May 2020 <br />March 2021 <br />15,504 <br />0 <br />97% <br />Higher Education <br />Abatement & Structural Demolition <br />Asbestos abatement and demolition of 3 towers (Misch/Hurst, Knotts/Edwards and Shively <br />student residential halls, as well as the dining complex, including basements for all 4 <br />structures). Other work of the project included crushing concrete debris from the demolition to <br />re -use as lower backfill of the demolition void of the basements and importing approximately <br />1'4' of soil to cap crushed concrete with for planting and future development. Relocation of <br />an existing bike path and construction/reconstruction of various sidewalks to accommodate <br />greenspoce development. Structural and architectural reconstruction to accommodate <br />remaining wing for long term temporary student housing. <br />Renascent: Experts in Demolition"" <br />
The URL can be used to link to this page
Your browser does not support the video tag.