My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Drewry’s Brewery Phase II - Bottling House Demo Proj No. 119-031D - Renascent Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Bids
>
Opening of Bids - Drewry’s Brewery Phase II - Bottling House Demo Proj No. 119-031D - Renascent Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2024 1:26:45 PM
Creation date
7/23/2024 1:23:42 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/23/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1NKU Barnes Campbell Hall, Bowling Green, KY <br />■ ■ ■ 7-r <br />Owner <br />General Contractor <br />Size <br />Delivery Method <br />Contract Value <br />Start Date <br />Completion Date <br />Total Hours Worked <br />Recordable Incidents <br />Recycle Rate <br />Industry Segment <br />Project Scope Summary <br />WKU Student Life Foundation, Inc. <br />Renascent, Inc. <br />9 stories, 105 ft tall, 74,426 square feet <br />Prime Contractor <br />$447,500 <br />December 2020 <br />March 2021 <br />3,534 <br />0 <br />98% <br />Higher Education <br />Structural demolition <br />C <br />Complete mechanical demolition of the 9-story Barnes Campbell Residence Hall on the <br />campus of Western Kentucky University, including foundation and footers, while protecting and <br />preserving a newly -built 6-story residence hall only 18 feet from Barnes Campbell. All brick, <br />concrete, ferrous and non-ferrous materials were recycled. <br />Renascent: Experts in Demolition" <br />
The URL can be used to link to this page
Your browser does not support the video tag.