My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Drewry’s Brewery Phase II - Bottling House Demo Proj No. 119-031D - Adamo Demolition
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Bids
>
Opening of Bids - Drewry’s Brewery Phase II - Bottling House Demo Proj No. 119-031D - Adamo Demolition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 1:21:50 PM
Creation date
7/23/2024 1:18:13 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/23/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1101 WASHINGTON BLVD., DETROIT, MI <br />This project was demolition of a <br />seven -story office and mixed use <br />building in Detroit, Ml, starting in MW <br />June 2022 and ending in September <br />IN <br />2022. The building was less than 18 <br />inches away from a building that is <br />part of the transit system and houses <br />a major bus depot, as well as the <br />People Mover. We had to factor in�,4, - - ,- <br />the downtown location, height of the <br />building, high -traffic roadways and <br />close proximity to a major public - <br />transit station. Fencing was installed, <br />and the roof and siding of the adjacent building was protected. Hand demolition of <br />the block wall and parapets was done to the adjacent building which remained <br />active. Traffic control and barricades were put up to close one lane of traffic on 2 <br />sides of the building. The building was demolished mechanically down to the <br />basement slab. Debris was <br />processed, sorted and loaded out <br />for disposal and recycling. We <br />relocated the fence back onto the <br />site and reopened the surrounding <br />i10 1 driving lanes. Backfill was done to <br />~'ram'; grade, surrounding sidewalks and <br />,..mom. <br />_ . mwmj parking lot was removed and final <br />OF site sweep up and equipment was <br />demobilized. This project had <br />4,000 tons of concrete and hard fill <br />'C recycled, 350 tons of scrap metal <br />Y p <br />recycled, all done ahead of <br />schedule, within budget and with <br />zero incidents or injuries. <br />
The URL can be used to link to this page
Your browser does not support the video tag.